Hoang Gia Industrial Cluster (Long An) is a key FDI destination in Duc Hoa District, covering 78.2 hectares in My Hanh Nam Commune, strategically located along a provincial arterial road. The site is 35 km from Ho Chi Minh City, 10 km from the HCMC – Trung Luong Expressway, 45 km from Tan Son Nhat International Airport, and 50 km from Cat Lai Port, offering excellent logistics connectivity across Southeast Vietnam. The project features modern, well-developed infrastructure, including stable power supply and an advanced wastewater treatment system, suitable for industries such as electronics, mechanical engineering, food processing, and high-tech manufacturing. With flexible land plots and an abundant workforce, and complete legal status, it stands out as an ideal destination for sustainable FDI investment in Long An.
Transportation Connectivity
Seaports: Cat Lai Port (Ho Chi Minh City): ~40 km; Long An International Port in close proximity
Highways: Direct access to National Highway 1A; Ben Luc – Long Thanh Expressway: ~15 km; Provincial Road 824 with convenient connectivity
Airport: Tan Son Nhat International Airport: 35–40 km
Urban Centers & Industrial Hubs
Ho Chi Minh City Center: 30–35 km (adjacent to Binh Chanh / Hoc Mon)
Tan An City (Long An): ~25 km
Major Industrial Clusters: Duc Hoa III Industrial Park: ~10 km; Xuyen A Industrial Park: ~15 km
Socioeconomic Resources
Workforce: Abundant labor supply from Duc Hoa and surrounding industrial zones
Internal Transport Infrastructure
Direct connectivity to National Highway 1A and Provincial Road 823, ensuring seamless regional access
Well-planned internal road network, ideal for small and medium-sized enterprises
Strategic proximity to Ho Chi Minh City, enhancing logistics efficiency and supply chain connectivity
Power Supply System
Stable and reliable electricity from the national grid (Duc Hoa 110/22kV substation)
Adequate capacity to support key industries such as electronics and mechanical manufacturing
Ready-to-use infrastructure for immediate production deployment
Water Supply System
Clean water sourced from a local, standards-compliant supply system
Sufficient capacity to meet current operational and production demands
Ensures uninterrupted business activities for existing and incoming investors
Wastewater Treatment Plant
Planned centralized system with a designed capacity of 1,500 m³/day
Civil construction completed, forming a solid foundation for final system integration
Strong commitment from local authorities to complete and ensure full environmental compliance
Clear roadmap for upgrade and operation, supporting sustainable industrial development
Electronics manufacturing and mechanical engineering
Food processing and light building materials production
Corporate Income Tax (CIT)
100% exemption for the first 2 years.
50% reduction for the following 4 years.
Import Tax
Import duty exemption for machinery, equipment, and goods imported to create fixed assets for the project.
Value Added Tax (VAT)
VAT exemption for imported materials used for manufacturing export products, in accordance with regulations.
Construction Regulations
Building density: Maximum 60% of industrial land plot area
Factory height: 12–15 m (1–3 floors), ensuring standard fire safety setbacks
Design Capacity
Electricity: 22kV national grid from Duc Hoa substation, meeting essential production demands
Clean Water: Stable local supply system, sufficient for current business operations
Wastewater Treatment: Centralized plant (1,500 m³/day), equipment installation in progress as directed by provincial authorities (target completion: 2025)
Fire Prevention & Fighting (FPF)
Internal roads: Connected to National Highway 1A, with sufficient width for fire truck access
Fire protection system: Compliant with basic standards for long-established industrial clusters
Infrastructure & Utility Fees
Infrastructure management fee: USD 0.15–0.25/m²/year (~VND 3,600–6,000/m²/year) – covering maintenance of roads, shared power, and water systems
Wastewater treatment fee: ~VND 8,000–12,000/m³ (~USD 0.33–0.50/m³) – centralized plant, currently under completion
Electricity tariff: As per Southern EVN (~VND 1,800–2,500/kWh; USD 0.07–0.10/kWh for industrial use)
Clean water tariff: ~VND 12,000–18,000/m³ (~USD 0.50–0.75/m³) supplied from the Duc Hoa system
IPAVIETNAM
Hotline/Zalo/WhatsApp: +84-83-555-3388
WeChat ID: fdivietnam
E-mail: support@ipavietnam.org
Contact person:
Mr. Gia Bao, Investment Promotion Officer
Cell phone: +84-941-898-117
E-mail: bao.ipavietnam@gmail.com
Note: We only provide consultancy service and information on industrial parks, industrial clusters, ready built factories to enterprises or investors who contact us directly. We do not exchange information through brokers or other intermediary channels.