Investment Location Search

Hiep My Tay Industrial Cluster

20
Slide 0
Slide 1

Hiep My Tay Industrial Cluster

Location: Vinh Long
Planned area: 39,72ha
Land use term: 50 years ( 2021 - 2071 )
Leasable area: 1 - 5 ha
Leasing price: Negotiation
Project highlights:

Hiep My Tay Industrial Cluster (Vinh Long) is a promising FDI destination in the Mekong Delta, covering 39.72 hectares in Hiep My Commune, Cau Ngang District, strategically located along National Highway 53. The project is approximately 150 km from Ho Chi Minh City, 110 km from Can Tho International Airport, and 30 km from Cai Cui Port, offering strong export logistics advantages. With modern infrastructure, the cluster allocates 23.22 hectares (58%) for industrial land, supported by a total investment of VND 300 billion, and operates from 2021 to 2071. It targets industries such as packaging, food processing, garments, footwear, pharmaceuticals, and mechanical engineering, ideal for SMEs and FDI investors.

Site connection

Transportation Connectivity
Cai Mep Port: 140 km – Major deep-water port
Cat Lai Port: 200 km – Vietnam’s largest container port
Ho Chi Minh City: 150 km – Southern economic hub
Airports & Urban Centers
Can Tho International Airport: 110 km – Key international gateway of the Mekong Delta
Tan Son Nhat International Airport: 200 km – Vietnam’s primary international airport
Tra Vinh City: 30 km – Provincial center 
Industrial Hubs & Workforce
Dinh An Industrial Park: 15 km – Major industrial cluster in Tra Vinh
Workforce: Abundant labor supply from Cau Ngang area

Infrastructure situation

Internal Infrastructure
Site leveling for selected zones has been completed
Internal road network under construction (Class III Delta standard, design speed 40 km/h)
Power & Water Supply
Electricity: 22kV power line ready, direct contract with EVN Tra Vinh
Clean Water: Agreement with Tra Vinh Water Supply Center, distribution network under design
Wastewater Treatment
Collection system along internal roads with a two-tier structure: on-plot collection and centralized treatment
Centralized wastewater treatment plant under construction in line with the 39.72-ha master plan

Attraction fields

Agro-processing
Seafood processing
Supporting industries
Agricultural machinery manufacturing
Light garment manufacturing

Investment Incentives

Corporate Income Tax (CIT)
100% exemption for the first 2 years.
50% reduction for the following 4 years.
Import Tax
Import duty exemption for machinery, equipment, and goods imported to create fixed assets for the project.
Value Added Tax (VAT)
VAT exemption for imported materials used for manufacturing export products, in accordance with regulations.
 

Technical information

Construction Regulations
Building density: Maximum 60% of industrial land (23.22 ha)
Factory height: 15–20 m (1–3 floors), compliant with fire safety standards
Design Capacity
Electricity: 22kV power line, direct contract with EVN Tra Vinh
Clean Water: Supplied by Tra Vinh Water Supply Center, distribution network along both sides of internal roads
Wastewater Treatment: Centralized treatment plant (two systems: on-plot collection and centralized facility)
Fire Prevention & Fighting (FPF)
Internal roads: Class III Delta standard, design speed 40 km/h, ensuring easy access for fire trucks
Technical infrastructure: 1.15 ha allocated for fire protection and supporting facilities

Related costs

Infrastructure & Utility Fees
Land lease price: USD 80/m² (for the entire lease term)
Infrastructure management fee: USD 0.3/m²/year
Wastewater treatment fee: VND 8,500/m³ (~USD 0.35/m³)
Clean water tariff: As per Tra Vinh Water Supply provider
Electricity tariff: As per EVN Tra Vinh (~USD 0.05–0.10/kWh)

Contact information

IPAVIETNAM
Hotline/Zalo/WhatsApp: +84-83-555-3388
WeChat ID: fdivietnam
E-mail: support@ipavietnam.org
Contact person:
Mr. Gia Bao, Investment Promotion Officer
Cell phone: +84-941-898-117
E-mail: bao.ipavietnam@gmail.com
Note: We only provide consultancy service and information on industrial parks, industrial clusters, ready built factories to enterprises or investors who contact us directly. We do not exchange information through brokers or other intermediary channels.

Video

No Video!

Document

No Document!

Other Industrial Clusters

See all >>
Hoang Gia Industrial Cluster
Hoang Gia Industrial Cluster
Tay Ninh | 78,2ha | Negotiation
Xay Da B Industrial Cluster
Xay Da B Industrial Cluster
Can Tho City | 53,9 ha | Negotiation
Tan Lap Industrial Cluster
Tan Lap Industrial Cluster
Dong Thap | 49,57ha | Negotiation
Long Phuoc Industrial Cluster
Long Phuoc Industrial Cluster
Vinh Long | 50ha | Negotiation
Tan Binh Industrial Cluster
Tan Binh Industrial Cluster
Vinh Long | 40,72ha | Negotiation
Quang Trung Industrial Cluster
Quang Trung Industrial Cluster
Dong Nai | 79,87 ha | Negotiation
Nhi Xuan industrial Cluster
Nhi Xuan industrial Cluster
Ho Chi Minh City | > 180ha | Negotiation
Uyen Hung industrial Cluster
Uyen Hung industrial Cluster
Ho Chi Minh City | 119,9633 ha | Negotiation
Hai Son - Duc Hoa Dong Industrial Cluster
Hai Son - Duc Hoa Dong Industrial Cluster
Tay Ninh | 261.215ha | Negotiation
Tam Linh Industrial Cluster
Tam Linh Industrial Cluster
Thanh Hoa | 37.07 ha | Negotiation
Le Mont Ha Chau 1&2 Industrial Cluster
Le Mont Ha Chau 1&2 Industrial Cluster
Thai Nguyen | Ha Chau 1: ~ 49ha. Ha Chau 2: ~ 46ha | Negotiation
Le Mont Xuan Phuong Industrial Cluster
Le Mont Xuan Phuong Industrial Cluster
Thai Nguyen | 74 ha | Negotiation