Hiep My Tay Industrial Cluster (Vinh Long) is a promising FDI destination in the Mekong Delta, covering 39.72 hectares in Hiep My Commune, Cau Ngang District, strategically located along National Highway 53. The project is approximately 150 km from Ho Chi Minh City, 110 km from Can Tho International Airport, and 30 km from Cai Cui Port, offering strong export logistics advantages. With modern infrastructure, the cluster allocates 23.22 hectares (58%) for industrial land, supported by a total investment of VND 300 billion, and operates from 2021 to 2071. It targets industries such as packaging, food processing, garments, footwear, pharmaceuticals, and mechanical engineering, ideal for SMEs and FDI investors.
Site connection
Transportation Connectivity
Cai Mep Port: 140 km – Major deep-water port
Cat Lai Port: 200 km – Vietnam’s largest container port
Ho Chi Minh City: 150 km – Southern economic hub Airports & Urban Centers
Can Tho International Airport: 110 km – Key international gateway of the Mekong Delta
Tan Son Nhat International Airport: 200 km – Vietnam’s primary international airport
Tra Vinh City: 30 km – Provincial center Industrial Hubs & Workforce
Dinh An Industrial Park: 15 km – Major industrial cluster in Tra Vinh
Workforce: Abundant labor supply from Cau Ngang area
Infrastructure situation
Internal Infrastructure
Site leveling for selected zones has been completed
Internal road network under construction (Class III Delta standard, design speed 40 km/h) Power & Water Supply
Electricity: 22kV power line ready, direct contract with EVN Tra Vinh
Clean Water: Agreement with Tra Vinh Water Supply Center, distribution network under design Wastewater Treatment
Collection system along internal roads with a two-tier structure: on-plot collection and centralized treatment
Centralized wastewater treatment plant under construction in line with the 39.72-ha master plan
Corporate Income Tax (CIT)
100% exemption for the first 2 years.
50% reduction for the following 4 years. Import Tax
Import duty exemption for machinery, equipment, and goods imported to create fixed assets for the project. Value Added Tax (VAT)
VAT exemption for imported materials used for manufacturing export products, in accordance with regulations.
Technical information
Construction Regulations
Building density: Maximum 60% of industrial land (23.22 ha)
Factory height: 15–20 m (1–3 floors), compliant with fire safety standards Design Capacity
Electricity: 22kV power line, direct contract with EVN Tra Vinh
Clean Water: Supplied by Tra Vinh Water Supply Center, distribution network along both sides of internal roads
Wastewater Treatment: Centralized treatment plant (two systems: on-plot collection and centralized facility) Fire Prevention & Fighting (FPF)
Internal roads: Class III Delta standard, design speed 40 km/h, ensuring easy access for fire trucks
Technical infrastructure: 1.15 ha allocated for fire protection and supporting facilities
Related costs
Infrastructure & Utility Fees
Land lease price: USD 80/m² (for the entire lease term)
Infrastructure management fee: USD 0.3/m²/year
Wastewater treatment fee: VND 8,500/m³ (~USD 0.35/m³)
Clean water tariff: As per Tra Vinh Water Supply provider
Electricity tariff: As per EVN Tra Vinh (~USD 0.05–0.10/kWh)
Contact information
IPAVIETNAM
Hotline/Zalo/WhatsApp: +84-83-555-3388
WeChat ID: fdivietnam
E-mail: support@ipavietnam.org
Contact person:
Mr. Gia Bao, Investment Promotion Officer
Cell phone: +84-941-898-117
E-mail: bao.ipavietnam@gmail.com Note: We only provide consultancy service and information on industrial parks, industrial clusters, ready built factories to enterprises or investors who contact us directly. We do not exchange information through brokers or other intermediary channels.