Investment Location Search

Ready-Built Factory at VSIP II Industrial Park, Binh Duong

54
Slide 0
Slide 1
Slide 2

Ready-Built Factory at VSIP II Industrial Park, Bi

Location: Ho Chi Minh City
Planned area: 31942 m2
Land use term: 2058
Leasable area: > 5,000 m2
Leasing price: Negotiation

Site connection

Transportation Connectivity
Cat Lai Port (Ho Chi Minh City): 25 km – Fast import-export access with direct container handling
Ho Chi Minh City – Long Thanh – Dau Giay Expressway: 5 km – Only 10 minutes for regional connectivity
Tan Son Nhat International Airport: 35 km – Approximately 45 minutes to international gateway
Ho Chi Minh City Center: 30 km – Around 40 minutes via National Highway 1A and expressway

        

Infrastructure situation

Internal Transport Infrastructure
Wide internal roads allowing direct container access to each facility, ensuring seamless logistics operations
Well-integrated connectivity with major routes such as National Highway 1A and Ho Chi Minh City – Long Thanh Expressway
Power Supply System
Stable 3-phase 380V electricity available 24/7, supported by a dedicated 1,500 KVA substation
Backup systems in place to ensure uninterrupted production and operational continuity
Water Supply & Wastewater Treatment
Adequate clean water supply for both production and domestic use, meeting operational standards
Fully developed drainage system ensuring efficient water management
Centralized wastewater treatment in compliance with regulations, supporting environmentally friendly industries

Investment Incentives

Corporate Income Tax (CIT)
Standard CIT rate at the time of signing: 20% per annum
New projects in industrial zones: 2-year tax exemption, followed by a 50% reduction for the next 4 years
Projects in specially incentivized sectors: 4-year tax exemption, followed by a 50% reduction for the next 9 years
Import & Export Duties
Import duty exemption for machinery and equipment used to form fixed assets
Import duty exemption for raw materials used in export production
Export duty exemption for exported goods

Contact information

IPAVIETNAM
Hotline/Zalo/WhatsApp: +84-83-555-3388
WeChat ID: fdivietnam
E-mail: support@ipavietnam.org
Contact person:
Mr. Gia Bao, Investment Promotion Officer
Cell phone: +84-941-898-117
E-mail: bao.ipavietnam@gmail.com
Note: We only provide consultancy service and information on industrial parks, industrial clusters, ready built factories to enterprises or investors who contact us directly. We do not exchange information through brokers or other intermediary channels.

Video

No Video!

Document

No Document!

Other Ready-Built Factories & Office Buildings

See all >>
Ready-built factory at Phu An Thanh Industrial Park
Ready-built factory at Phu An Thanh Industrial Park
Tay Ninh | 13,4ha | Negotiation
Ready-built factory at Phuoc Dong Port Industrial Park
Ready-built factory at Phuoc Dong Port Industrial Park
Tay Ninh | Updating... | Negotiation
Ready-built factory, Eco Logistics Center Binh Duong
Ready-built factory, Eco Logistics Center Binh Duong
Ho Chi Minh City | 7,5 ha | Negotiation
Ready-built factory at Long Hau Industrial Park
Ready-built factory at Long Hau Industrial Park
Tay Ninh | 50.000 m2 | Negotiation
Viettel TechHub Danang
Viettel TechHub Danang
Da Nang City | 100.000 m² | Negotiation
FPV - Yen Phong Expansion
FPV - Yen Phong Expansion
Bac Ninh | 25 ha | Negotiation
FPV - Dong Mai
FPV - Dong Mai
Quang Ninh | 12.5 ha | Negotiation
FPV - Binh Duong Industrial Park
FPV - Binh Duong Industrial Park
Ho Chi Minh City | 106 ha | Negotiation
FPV - Industrial Centre Yen Phong 2C
FPV - Industrial Centre Yen Phong 2C
Bac Ninh | 13.6 ha | Negotiation
FPV - Industrial Centre Yen My
FPV - Industrial Centre Yen My
Hung Yen | 26.5 ha | Negotiation
RBF in Dau Giay IZ-Dong Nai
RBF in Dau Giay IZ-Dong Nai
Dong Nai | 328 ha | Negotiation
RBF in Bau Bang IP-Binh Duong
RBF in Bau Bang IP-Binh Duong
Ho Chi Minh City | Updating... | Negotiation