Investment Location Search

Ready-built factory at Phu An Thanh Industrial Park

195
Slide 0
Slide 1
Slide 2

Ready-built factory at Phu An Thanh Industrial Par

Location: Tay Ninh
Planned area: 13,4ha
Land use term: 50 years
Leasable area: > 20,000 m2
Leasing price: Negotiation
Project highlights:

Phu An Thanh Industrial Park ready-built factory benefits from a strategic location in Ben Luc, offering quick access to expressways, Cat Lai Port, Ho Chi Minh City, and Tan Son Nhat Airport, significantly reducing logistics time. The project provides two flexible options: ready-built factories for immediate operation and build-to-suit solutions tailored to specific production needs, including heavy industries. Optimized technical specifications such as high floor load capacity, stable power supply, and modern design ensure efficient operations. Fully integrated infrastructure includes solar power, automatic sprinkler systems, standard-compliant wastewater treatment, and 24/7 security. With a large nearby workforce and well-developed surrounding amenities, it offers a safe, stable, and sustainable investment environment.

Site connection

Seaport Connectivity
Long An Port: 40 km – serving import–export for the Mekong Delta region
Cat Lai Port: 45 km – largest container port in Vietnam
Bourbon Port: 7 km – inland waterway transport via Vam Co Dong River
Expressways
Saigon – Trung Luong Expressway: 3 km – key interchange at Ben Luc
Ben Luc – Long Thanh Expressway: 20 km – high-speed East–West connectivity
Airport
Tan Son Nhat International Airport: 38 km – approximately 60 minutes for international
travel
City Center
Ho Chi Minh City (District 1): 37 km – about 45 minutes to the economic center

Investment Incentives

Corporate Income Tax (CIT)
Standard CIT rate at the time of signing: 20% per annum
New projects in industrial zones: 2-year tax exemption, followed by a 50% reduction for the next 4 years
Projects in specially incentivized sectors: 4-year tax exemption, followed by a 50% reduction for the next 9 years
Import & Export Duties
Import duty exemption for machinery and equipment used to form fixed assets
Import duty exemption for raw materials used in export production
Export duty exemption for exported goods

Technical information

Technical Regulations
Construction density: 50–60% in compliance with QCVN 01:2021/BXD – optimizing land use efficiency
Fire protection: Automatic sprinkler system + firefighting system compliant with TCVN 6160
Wastewater treatment: Centralized industrial park system meeting Column A – QCVN 40 standards
Ready-built Factories
Total area: 31,572 m² (flexible from 2,870–17,220 m²)
Height: 7 m – suitable for standard manufacturing
Floor load capacity: 2 tons/m² – suitable for medium-load machinery
Power supply: 100 kVA/1,000 m² – stable 3-phase electricity
Build-to-Suit Factories
Total area: 13,275 m² (flexible from 4,091–13,275 m²)
Height: 10.5 m – suitable for heavy mechanical industries
Floor load capacity: 3 tons/m² – superior load-bearing capacity
Power supply: 25–100 kVA/1,000 m² – customizable based on requirements

Contact information

IPAVIETNAM
Hotline/Zalo/WhatsApp: +84-83-555-3388
WeChat ID: fdivietnam
E-mail: support@ipavietnam.org
Contact person:
Mr. Gia Bao, Investment Promotion Officer
Cell phone: +84-941-898-117
E-mail: bao.ipavietnam@gmail.com
Note: We only provide consultancy service and information on industrial parks, industrial clusters, ready built factories to enterprises or investors who contact us directly. We do not exchange information through brokers or other intermediary channels.

Video

No Video!

Document

No Document!

Other Ready-Built Factories & Office Buildings

See all >>
Leasing system of 05 Viettel Office Buildings nationwide
Leasing system of 05 Viettel Office Buildings nationwide
Updating... | 18.806 m2 | < $3
Leasing system of 23 Viettel Office Buildings nationwide
Leasing system of 23 Viettel Office Buildings nationwide
Updating... | 109.373 m2 | < $3
Level 19 – Tower A1 Viettel Complex Building
Level 19 – Tower A1 Viettel Complex Building
Ho Chi Minh City | ~ 1.200m² | > $9
Serviced Factory Lot A23, A24 in Da Nang Hi-tech Park
Serviced Factory Lot A23, A24 in Da Nang Hi-tech Park
Da Nang City | 15 ha | Negotiation
Ready-built factory at Giang Dien Industrial Park
Ready-built factory at Giang Dien Industrial Park
Dong Nai | Updating... | Negotiation
Ready-built factory at An Phuoc Industrial Park
Ready-built factory at An Phuoc Industrial Park
Dong Nai | Updating... | Negotiation
KTG Ready-Built Factory at Nhon Trach 2 Industrial Park
KTG Ready-Built Factory at Nhon Trach 2 Industrial Park
Dong Nai | 18,69 ha | Negotiation
Ready-built factory at Dau Giay Industrial Park
Ready-built factory at Dau Giay Industrial Park
Dong Nai | 8,38 ha | Negotiation
Ready-built factory at Nhon Trach 1 Industrial Park
Ready-built factory at Nhon Trach 1 Industrial Park
Dong Nai | 7,56 ha | Negotiation
Ready-built factory at Phuoc Dong Port Industrial Park
Ready-built factory at Phuoc Dong Port Industrial Park
Tay Ninh | Updating... | Negotiation
Ready-built factory, Eco Logistics Center Binh Duong
Ready-built factory, Eco Logistics Center Binh Duong
Ho Chi Minh City | 7,5 ha | Negotiation
Ready-built factory at Long Hau Industrial Park
Ready-built factory at Long Hau Industrial Park
Tay Ninh | 50.000 m2 | Negotiation