Investment Location Search

KTG Ready-Built Factory at Nhon Trach 2 Industrial Park

22
Slide 0
Slide 1
Slide 2
Slide 3

KTG Ready-Built Factory at Nhon Trach 2 Industrial

Location: Dong Nai
Planned area: 18,69 ha
Land use term: 50 years
Leasable area: > 3,500 m2
Leasing price: Negotiation
Project highlights:

KTG ready-built factory in Dong Nai features a strategic logistics location with fast connectivity to Cat Lai Port, Long Thanh International Airport, and Ho Chi Minh City, as well as convenient access to Saigon Hi-Tech Park. The project offers a versatile two-storey factory model with over 28,000 sqm of space and high floor load capacity, suitable for both manufacturing and logistics operations. International-standard infrastructure includes stable power supply, high-quality concrete flooring, and a comprehensive fire protection system, ready for immediate operation. Competitive rental rates compared to Ho Chi Minh City, combined with a large available workforce, help optimize investment efficiency. A well-developed ecosystem with nearby urban areas and premium services ensures a safe, modern, and sustainable working environment.

Site connection

Seaport Connectivity
Cat Lai Port: 29 km (~35 minutes) – largest container port in Vietnam
Cai Mep – Thi Vai Port: 40 km (~50 minutes) – deep-sea port for large vessels
Expressway
Ho Chi Minh City – Long Thanh – Dau Giay Expressway: Nearby – key artery of the Southeast region
Airports
Tan Son Nhat International Airport: 40 km (~50 minutes) – existing international airport
Long Thanh International Airport (future): 25 km (~25 minutes) – upcoming aviation hub
City Center
Ho Chi Minh City Center: 35 km (~40 minutes)
District 2, Ho Chi Minh City: 27 km (~30 minutes) – emerging urban area
Major Industrial Hub
Saigon Hi-Tech Park: 33 km (~35 minutes) – leading high-tech hub

Investment Incentives

Corporate Income Tax (CIT)
Standard CIT rate at the time of signing: 20% per annum
New projects in industrial zones: 2-year tax exemption, followed by a 50% reduction for the next 4 years
Projects in specially incentivized sectors: 4-year tax exemption, followed by a 50% reduction for the next 9 years
Import & Export Duties
Import duty exemption for machinery and equipment used to form fixed assets
Import duty exemption for raw materials used in export production
Export duty exemption for exported goods

Technical information

Technical Regulations
Construction density: 50–60% in compliance with QCVN 01:2021/BXD – optimized for industrial park development
Fire protection: Complete firefighting system with fire alarm and smoke extraction, compliant with TCVN 6160
Wastewater treatment: Centralized industrial park system meeting Column A – QCVN 40 standards
Two-Storey Factory Specifications
Area

Ground floor: 3,035–13,800 m²
Second floor: 1,577–14,041 m²
Height
Ground floor: 8 m
Second floor: 7 m (floor slab thickness: 0.3 m)
Floor load capacity: 2 tons/m² – suitable for standard manufacturing and logistics
Power supply: 100 W/m² – stable 3-phase electricity, 24/7
Materials & Systems
Reinforced concrete flooring with hardener coating for dust and crack resistanceComprehensive fire protection system: fire hose reels, sprinklers, fire alarm, and smoke extraction system

Contact information

IPAVIETNAM
Hotline/Zalo/WhatsApp: +84-83-555-3388
WeChat ID: fdivietnam
E-mail: support@ipavietnam.org
Contact person:
Mr. Gia Bao, Investment Promotion Officer
Cell phone: +84-941-898-117
E-mail: bao.ipavietnam@gmail.com
Note: We only provide consultancy service and information on industrial parks, industrial clusters, ready built factories to enterprises or investors who contact us directly. We do not exchange information through brokers or other intermediary channels.

Video

No Video!

Document

No Document!

Other Ready-Built Factories & Office Buildings

See all >>
Ready-built factory at Giang Dien Industrial Park
Ready-built factory at Giang Dien Industrial Park
Dong Nai | Updating... | Negotiation
Ready-built factory at An Phuoc Industrial Park
Ready-built factory at An Phuoc Industrial Park
Dong Nai | Updating... | Negotiation
Ready-built factory at Dau Giay Industrial Park
Ready-built factory at Dau Giay Industrial Park
Dong Nai | 8,38 ha | Negotiation
Ready-built factory at Nhon Trach 1 Industrial Park
Ready-built factory at Nhon Trach 1 Industrial Park
Dong Nai | 7,56 ha | Negotiation
Ready-built factory at Phu An Thanh Industrial Park
Ready-built factory at Phu An Thanh Industrial Park
Tay Ninh | 13,4ha | Negotiation
Ready-built factory at Phuoc Dong Port Industrial Park
Ready-built factory at Phuoc Dong Port Industrial Park
Tay Ninh | Updating... | Negotiation
Ready-built factory, Eco Logistics Center Binh Duong
Ready-built factory, Eco Logistics Center Binh Duong
Ho Chi Minh City | 7,5 ha | Negotiation
Ready-built factory at Long Hau Industrial Park
Ready-built factory at Long Hau Industrial Park
Tay Ninh | 50.000 m2 | Negotiation
Ready-Built Factory at VSIP II Industrial Park, Binh Duong
Ready-Built Factory at VSIP II Industrial Park, Binh Duong
Ho Chi Minh City | 31942 m2 | Negotiation
Viettel TechHub Danang
Viettel TechHub Danang
Da Nang City | 100.000 m² | Negotiation
FPV - Yen Phong Expansion
FPV - Yen Phong Expansion
Bac Ninh | 25 ha | Negotiation
FPV - Dong Mai
FPV - Dong Mai
Quang Ninh | 12.5 ha | Negotiation