Please Login to use our services.
If you are not our member, please register here or contact us via email support@ipavietnam.org for our further support.
Dau Giay Industrial Park ready-built factory stands out with a large-scale 83,835 sqm single-storey design, ideal for both logistics and heavy manufacturing operations. High floor load capacity supports heavy machinery and large-volume goods, ensuring efficient operations. Strategically located at a key interchange in Dong Nai, the project offers direct connectivity to major expressways, National Highway 1, and National Highway 20, linking the Southeast region with the Central Highlands. Proximity to Long Thanh International Airport and major ports enhances supply chain efficiency. Fully integrated infrastructure includes stable three-phase power, standard-compliant wastewater treatment, and automatic sprinkler systems, providing a safe, reliable, and high-performance environment for long-term investment.
Seaport Connectivity
Dong Nai Port: 38 km – serving Eastern region logistics
Cat Lai Port: 70 km – largest container port in Vietnam
Phu My Port: 45 km – deep-sea port for large vessels
Thi Vai – Cai Mep Port Cluster: 50 km
Expressways & Highways
Ho Chi Minh City – Long Thanh – Dau Giay Expressway: 0–2 km – located right at Dau Giay interchange
National Highway 1: 2 km
National Highway 20: 2 km – approximately 3 hours to Da Lat
Airports
Long Thanh International Airport: 25 km – future international aviation hub
Tan Son Nhat International Airport: 70 km – approximately 90 minutes travel time
Corporate Income Tax (CIT)
Standard CIT rate at the time of signing: 20% per annum
New projects in industrial zones: 2-year tax exemption, followed by a 50% reduction for the next 4 years
Projects in specially incentivized sectors: 4-year tax exemption, followed by a 50% reduction for the next 9 years
Import & Export Duties
Import duty exemption for machinery and equipment used to form fixed assets
Import duty exemption for raw materials used in export production
Export duty exemption for exported goods
Technical Regulations
Construction density: 50–60% in compliance with QCVN 01:2021/BXD
Fire protection: Automatic sprinkler system + firefighting system compliant with TCVN 6160
Wastewater treatment: Centralized industrial park system meeting Column A – QCVN 40 standards
Single-Storey Ready-Built Factory (RBF) Specifications
Total area: 83,835 m² – suitable for large-scale logistics and manufacturing
Floor load capacity: 2 tons/m² – supports standard industrial machinery
Strategic location: Situated at Dau Giay expressway interchange – ensuring smooth container traffic and logistics efficiency
IPAVIETNAM
Hotline/Zalo/WhatsApp: +84-83-555-3388
WeChat ID: fdivietnam
E-mail: support@ipavietnam.org
Contact person:
Mr. Gia Bao, Investment Promotion Officer
Cell phone: +84-941-898-117
E-mail: bao.ipavietnam@gmail.com
Note: We only provide consultancy service and information on industrial parks, industrial clusters, ready built factories to enterprises or investors who contact us directly. We do not exchange information through brokers or other intermediary channels.
No Document!