Investment Location Search

RBF in Binh Duong

3456
Slide 0

RBF0007

Location: Ho Chi Minh City
Planned area: 186,000 m2
Land use term: 50 years
Leasable area: > 5,000 m2
Leasing price: $7 - $7.5

Site connection

To Ho Chi Minh City: 40 km.
To Tan Son Nhat Airport: 40 km.
To Cat Lai Port: 50 km.
To Cai Mep Port: 85 km.

Infrastructure situation

Located inside VSIP 2, Binh Duong Province.
Land is available. Workshop is under construction.
Internal roads: the entire internal road system is 25m wide (15m wide plastic surface and 5m wide each side of the corridor) with load bearing capacity of 40-60 tons / 01 truck.
• Electricity: the national electricity grid provides electricity to the boundaries of land plots, ensuring to meet the demands of businesses.
• Water: clean water is treated according to WHO standards provided by a specialized agency to the boundaries of the land lots.
• Post and telecommunications: pre-installed telephone lines to the boundaries of land lots and fully supplied according to customer needs, unlimited quantity. Fiber optic systems can be connected to broadband (telecom) broadband applications and leased line systems.
• Wastewater treatment plant (treated from type B to A) with large capacity, ensuring the reception and treatment up to prescribed standards before being discharged into the environment.
• Fire protection: professional fire protection team in industrial zone. The system of water supply hose along the internal roads, the 24/7 security forces are trained in fire prevention and fighting skills.

Contact information

IPAVIETNAM
Hotline: +84-83-555-3388
Email: advisor@ipavietnam.org

Document

No Document!

Other Ready-Built Factories & Office Buildings

See all >>
Ready-built factory at Giang Dien Industrial Park
Ready-built factory at Giang Dien Industrial Park
Dong Nai | Updating... | Negotiation
Ready-built factory at An Phuoc Industrial Park
Ready-built factory at An Phuoc Industrial Park
Dong Nai | Updating... | Negotiation
KTG Ready-Built Factory at Nhon Trach 2 Industrial Park
KTG Ready-Built Factory at Nhon Trach 2 Industrial Park
Dong Nai | 18,69 ha | Negotiation
Ready-built factory at Dau Giay Industrial Park
Ready-built factory at Dau Giay Industrial Park
Dong Nai | 8,38 ha | Negotiation
Ready-built factory at Nhon Trach 1 Industrial Park
Ready-built factory at Nhon Trach 1 Industrial Park
Dong Nai | 7,56 ha | Negotiation
Ready-built factory at Phu An Thanh Industrial Park
Ready-built factory at Phu An Thanh Industrial Park
Tay Ninh | 13,4ha | Negotiation
Ready-built factory at Phuoc Dong Port Industrial Park
Ready-built factory at Phuoc Dong Port Industrial Park
Tay Ninh | Updating... | Negotiation
Ready-built factory, Eco Logistics Center Binh Duong
Ready-built factory, Eco Logistics Center Binh Duong
Ho Chi Minh City | 7,5 ha | Negotiation
Ready-built factory at Long Hau Industrial Park
Ready-built factory at Long Hau Industrial Park
Tay Ninh | 50.000 m2 | Negotiation
Ready-Built Factory at VSIP II Industrial Park, Binh Duong
Ready-Built Factory at VSIP II Industrial Park, Binh Duong
Ho Chi Minh City | 31942 m2 | Negotiation
Viettel TechHub Danang
Viettel TechHub Danang
Da Nang City | 100.000 m² | Negotiation
FPV - Yen Phong Expansion
FPV - Yen Phong Expansion
Bac Ninh | 25 ha | Negotiation