Location: Nghe An
Planned area: 3200 ha
Land use term: 2017-2067
Leasable area: 30 - 50 ha
Leasing price: $60 - $70

Site connection

Distance to Vinh airport: 15 km
Distance to the seaport cluster: 11 - 17 km
Distance to Vinh city: 18 km

Infrastructure situation

Electricity supply:
- Power supply is continuous and stable from 110KV high voltage line
- 2 dedicated transmission lines of 22KV from Cua Lo substation, with capacity of 65MVA.
Drainage and Flood Control System:
- Dike at the height of 4.30 m. with drainage pumping system.
- Internal drainage channel, box and pipe culvert system to receive run-off from the land plots
Water supply:
- 4,000 - 12,000 m3/day (expandable).
- Standard supply 30 m3/ha/day
- Source from Cam River.
Internal traffic 
- Road System.
- Main road with 67m right of way, 4 lanes with reinforced concrete pavement.
- Secondary road with 30m right of way, 2 lanes with reinforced concrete pavement.
- LED Light system is installed along the roads.

Attraction fields

315,319,317,466,465,320,

Investment Incentives

CIT

The preferential tax rate of 10% for 15 years, in which:
-  CIT exemption for the first 4 years
-  Followed by 50% tax reduction for subsequent 9 years

Remarks: A tax holiday and tax reduction shall start from the first profit-making year or the fourth revenue-generation year whichever comes first.

Import Tax

Exemption for:
a) Machines and Equipment to create fixed assets
b) Materials & components that cannot be produced domestically (5 years)

Noted: Used machine & Equipment are required the inspection certificate to certified the capacity at least 85% (Decree No 18/2019/QD/TTg)

Related costs

- Treated Water supply: VND 11,000 per cubic meter
- Wastewater treatment: VND 6,000 per cubic meter
- Management fee: USD 0.065 per square meter per month.
- Utilities connection fee (one time only):
  + Drainage Systems: USD 2,000 (One connection)
  + Treated Water supply & Wastewater Treatment: USD 4,000 (One connection)

Contact information

IPAVIETNAM
Hotline: +84-98-369-3699 | +84-83-555-3388
Email: support@ipavietnam.org​

Document

No Document!

Other Industrial Parks

See all >>
Tang Loong Industrial Park
Tang Loong Industrial Park
Lao Cai | 1,100 ha | $60 - $70
Dong Banh Industrial Park
Dong Banh Industrial Park
Lang Son | 162 ha | $70 - $80
VSIP Lang Son Industrial Park
VSIP Lang Son Industrial Park
Lang Son | 599.76 ha | $100 - $110
Tan Dan Industrial Park
Tan Dan Industrial Park
Hung Yen | 200 ha | $160 - $170
Yen My Industrial Park
Yen My Industrial Park
Hung Yen | 280 ha | $160 - $170
Industrial Park No. 03 – Hung Yen
Industrial Park No. 03 – Hung Yen
Hung Yen | 159.71 ha | $140 - $150
Yen My II Industrial Park
Yen My II Industrial Park
Hung Yen | 313,5 ha | Negotiation
Industrial Park No. 1 – Phase 1
Industrial Park No. 1 – Phase 1
Hung Yen | 216.17 ha | $150 - $160
Ly Thuong Kiet Industrial Park
Ly Thuong Kiet Industrial Park
Hung Yen | 314.2 ha | $150 - $160
Lac Thinh Industrial Park
Lac Thinh Industrial Park
Phu Tho | 220 ha | $80 - $90
Binh Phu Industrial Park
Binh Phu Industrial Park
Phu Tho | 214.29 ha | $100 - $110
Thanh Ha Industrial Park
Thanh Ha Industrial Park
Phu Tho | 282 ha | $90 - $100