Please Login to use our services.
If you are not our member, please register here or contact us via email support@ipavietnam.org for our further support.
Tang Loong Industrial Park asserts its position as the largest metallurgy and chemical hub in Northern Vietnam, thanks to its direct access to abundant mineral resource areas, particularly Apatite ore. The project's outstanding advantage is the specialized railway system connected directly to the factories, optimizing transportation costs for heavy goods and raw ores to seaports or international border gates. With a total planned area of 1,100 hectares and high-capacity power and water infrastructure, Tang Loong IP is an ideal destination for heavy industry corporations looking to leverage on-site raw material supply chains, competitive land rental costs, and the highest investment incentives available for regions with especially difficult socio-economic conditions.
Located near the Noi Bai – Lao Cai Expressway with a specialized internal railway system connected directly to the National Hanoi – Lao Cai railway line.
Distance to Border: Approximately 35 km from the Lao Cai International Border Gate, facilitating seamless trade with China.
Distance to Hanoi: Approximately 260 km from Hanoi city center.
Power Supply: High-capacity industrial power sourced from the national grid via internal 110kV substations, specifically designed for energy-intensive smelting furnaces.
Water Supply: Large-scale water supply stations sourcing from nearby natural water bodies to meet the cooling and chemical production requirements.
Wastewater Treatment: Centralized wastewater treatment plant with a capacity of 3,000 m3/day (currently being upgraded) to strictly control chemical discharge indicators.
Railway Infrastructure: Features private railway branches leading directly into major factories, significantly optimizing transportation costs for heavy minerals and finished products.
Metallurgy: Production of steel billets, pig iron, copper, and iron ore.
Chemical Industry: Manufacturing of yellow phosphorus, sulfuric acid, DAP fertilizer, and ore flotation.
Construction Materials: Production of building materials derived from industrial by-products.
Support Industries: Services and equipment manufacturing for mining and mineral processing.
Logistics: Specialized warehousing and logistics services for heavy industrial goods and raw minerals.
Construction density: ≤ 70%
Factory height: Typically 2–5 floors
Green space ratio: ≥ 10%
Building setback: Minimum 4 m (long side), 3.5 m (gable side)
Management fee: ~USD 0.5–1/m²/year
Ready-built factory rent: ~USD 3.5–5.5/m²/month
Electricity cost: ~USD 0.08–0.12/kWh
Water supply cost: ~USD 0.4–0.8/m³
Wastewater treatment fee: ~USD 0.3–0.6/m³
IPAVIETNAM
Hotline/Zalo/WhatsApp: +84-83-555-3388
WeChat ID: fdivietnam
E-mail: support@ipavietnam.org
Contact person:
Mr. Gia Bao, Investment Promotion Officer
Cell phone: +84-941-898-117
E-mail: bao.ipavietnam@gmail.com
Note: We only provide consultancy service and information on industrial parks, industrial clusters, ready built factories to enterprises or investors who contact us directly. We do not exchange information through brokers or other intermediary channels.
No Document!