Please Login to use our services.
If you are not our member, please register here or contact us via email support@ipavietnam.org for our further support.
Tay Bac Quan Hau Industrial Park covers an area of 220.82 hectares, offering competitive leasing rates compared to other industrial parks in the Central region of Vietnam. The park enjoys a prime location along National Highway 1A, close to the North–South Expressway, approximately 11 km from Dong Hoi City, 73 km from Hon La Port, and 161 km from Cha Lo International Border Gate, providing convenient connectivity to Laos and Thailand. The park features synchronized infrastructure invested by the Management Board of the Economic Zone, including 13–24 m wide internal roads, a stable medium-voltage power supply, standardized wastewater treatment, and high-speed telecommunications systems. It is oriented toward clean and multi-industry development, such as garment and textile manufacturing, footwear, mechanical engineering, and processing industries, benefiting from an abundant and cost-effective labor force. The industrial park also offers strong advantages, including attractive tax incentives, a large availability of ready-to-lease land, and opportunities arising from the rapid economic growth of Quang Binh Province.
Connectivity
Hon La Port: 73 km
Vung Ang Port: 100 km
North-South Expressway: Via QL1A (nearby)
National Highway 1A: Directly on route
Services & Resources
Dong Hoi City Center: 11 km
Cha Lo Border Gate (Vietnam-Laos): 161 km
Abundant Labor: Quang Ninh district population
Schools & Hospitals: Near Quan Hau town
Internal Transportation
Internal roads are 13–24 meters wide, connecting to National Highway 1A and the Dong Hoi bypass (basically completed).
Power Supply System
22kV power lines supplied from a 110kV substation, with a separate public lighting network (completed).
Water Supply
A stable water supply system for domestic and industrial use from the provincial water source (completed).
Wastewater Treatment
Centralized wastewater treatment plant.
Textiles and footwear
Processing of agricultural and forestry products
Production of building materials
Electronics and mechanical engineering
Assembly of automobiles and motorcycles
Corporate Income Tax (CIT) Incentives
Preferential tax rate: 10% for 15 years (instead of the standard 20%).
Standard sectors/projects
2-year tax exemption, followed by a 50% reduction for the next 4 years.
High-tech projects (certified by the Ministry of Science and Technology):
4-year tax exemption, followed by a 50% reduction for the subsequent 9 years.
Import Duty Incentives
Import duty exemption applies to
Goods forming fixed assets of incentive-eligible investment projects.
Raw materials and components not yet produced domestically (subject to confirmation by the Ministry of Industry and Trade).
Goods used for manufacturing export products (in accordance with Article 16 of Law No. 107/2016/QH13).
Building Density
Factories/warehouses: 60–70% of the land plot area (152.16 ha of industrial land out of a total 220.82 ha).
Allocation: Main production areas, green spaces, and internal roads account for 30–40%.
Factory Height
Maximum 4–6 floors according to the detailed planning; setback distance ≥ 6 m from main roads (22.5–32 m wide).
Power Capacity
Two 220kV/35kV transmission lines and a 110kV substation ensure a stable power supply for production.
Water Capacity
Water supply station with a capacity of 8,300 m³/day, sourced from An Ma Reservoir.
Wastewater Treatment
4 pumping stations with a capacity of 2,000–4,500 m³/day, with a separate drainage system.
Fire Prevention and Fighting (PCCC)
Grid-pattern internal roads 13–24 m wide to facilitate fire trucks, with a complete lighting and drainage system.
Infrastructure & Management Fees
Land rental price: 4,500 VND/m²/year (~0.18 USD/m²/year).
Infrastructure rental fee: 3,500 VND/m²/year (~0.14 USD/m²/year).
Basic Utilities
Clean water price: 0.40–0.45 USD/m³ (estimated based on the Quang Binh standard).
Wastewater treatment fee: 0.25–0.35 USD/m³.
Electricity price (EVN): 0.13 USD/kWh during peak hours; 0.08 USD/kWh.
IPAVIETNAM
Hotline/Zalo/WhatsApp: +84-83-555-3388
WeChat ID: fdivietnam
E-mail: support@ipavietnam.org
Contact person:
Mr. Gia Bao, Investment Promotion Officer
Cell phone: +84-941-898-117
E-mail: bao.ipavietnam@gmail.com
Note: We only provide consultancy service and information on industrial parks, industrial clusters, ready built factories to enterprises or investors who contact us directly. We do not exchange information through brokers or other intermediary channels.
No Document!