Tay Bac Quan Hau Industrial Park covers an area of 220.82 hectares, offering competitive leasing rates compared to other industrial parks in the Central region of Vietnam. The park enjoys a prime location along National Highway 1A, close to the North–South Expressway, approximately 11 km from Dong Hoi City, 73 km from Hon La Port, and 161 km from Cha Lo International Border Gate, providing convenient connectivity to Laos and Thailand. The park features synchronized infrastructure invested by the Management Board of the Economic Zone, including 13–24 m wide internal roads, a stable medium-voltage power supply, standardized wastewater treatment, and high-speed telecommunications systems. It is oriented toward clean and multi-industry development, such as garment and textile manufacturing, footwear, mechanical engineering, and processing industries, benefiting from an abundant and cost-effective labor force. The industrial park also offers strong advantages, including attractive tax incentives, a large availability of ready-to-lease land, and opportunities arising from the rapid economic growth of Quang Binh Province.
Transportation Connectivity
Distance to the nearest major cities: Approximately 80 km to Hue City and 110 km to Quang Tri City.
Distance to the provincial center: About 32 km north of Dong Ha City center.
Distance to the nearest airports: Around 30 km to Quang Tri Airport, 71 km to Dong Hoi Airport (Quang Binh), and 120 km to Phu Bai International Airport (Hue City).
Distance to the nearest railway station: From Zone B of Tay Bac Ho Xa Industrial Park to San Lung Railway Station is approximately 500 meters.
Distance to the nearest seaport: Approximately 35 km to Cua Viet Port.
Internal Transportation
The main roads are 30–45 m wide (4–6 lanes), while branch roads are 15–25 m wide, paved with asphalt and equipped with drainage systems and LED street lighting.
They provide direct connections to National Highway 1A, National Highway 9D, and the North–South Expressway.
Power Supply System
A 110/22 kV – 40 MVA substation supplies electricity, with 22 kV power delivered to factory gates.
Water Supply
A clean water plant with a capacity of 10,000 m³/day (Phase 1), meeting standards for industrial production.
Wastewater Treatment
A centralized wastewater treatment plant with a capacity of 4,000 m³/day, meeting Column A standards under QCVN 40:2011/BTNMT.
Textiles and footwear
Handicrafts
Wood and bamboo processing
Mechanical manufacturing and assembly
Food processing
Corporate Income Tax (CIT) Incentives
Preferential tax rate: 10% for 15 years (instead of the standard 20%).
Standard sectors/projects
2-year tax exemption, followed by a 50% reduction for the next 4 years.
High-tech projects (certified by the Ministry of Science and Technology):
4-year tax exemption, followed by a 50% reduction for the subsequent 9 years.
Import Duty Incentives
Import duty exemption applies to
Goods forming fixed assets of incentive-eligible investment projects.
Raw materials and components not yet produced domestically (subject to confirmation by the Ministry of Industry and Trade).
Goods used for manufacturing export products (in accordance with Article 16 of Law No. 107/2016/QH13).
Building Density
Factories/warehouses: 60–70% of the land plot area, in accordance with the master plan for main production allocation.
Factory Height
As specified in the detailed design, with a minimum setback of ≥6 m, ensuring architectural harmony along the 30–45 m wide main roads.
Fire Prevention and Fighting (PCCC)
The main and branch roads are designed to accommodate fire trucks, and all fire protection systems must be appraised and approved in accordance with regulations.
Infrastructure & Management Fees
Management and maintenance fee: 0.6 USD/m²/year.
Infrastructure leasing price: 70 USD/m² per lease term (long-term).
Basic Utilities
Clean water price: 0.5 USD/m³.
Wastewater treatment fee: 0.5 USD/m³.
Electricity price (EVN): Peak hours ~0.13 USD/kWh; normal hours ~0.08 USD/kWh.
IPAVIETNAM
Hotline/Zalo/WhatsApp: +84-83-555-3388
WeChat ID: fdivietnam
E-mail: support@ipavietnam.org
Contact person:
Mr. Gia Bao, Investment Promotion Officer
Cell phone: +84-941-898-117
E-mail: bao.ipavietnam@gmail.com
Note: We only provide consultancy service and information on industrial parks, industrial clusters, ready built factories to enterprises or investors who contact us directly. We do not exchange information through brokers or other intermediary channels.
No Document!