Please Login to use our services.
If you are not our member, please register here or contact us via email support@ipavietnam.org for our further support.
Tan Huong Industrial Park enjoys a strategic gateway location in Tien Giang Province, just 150 meters from National Highway 1A, with direct access to the HCMC – Trung Luong Expressway, Ho Chi Minh City (50 km), and My Tho City (12 km). The park benefits from strong connectivity to Hiep Phuoc Port and Tan Son Nhat International Airport, supporting flexible logistics for manufacturing and export activities.
The park features synchronized infrastructure, including 20–30 meter internal roads, stable 110kV power supply, 4,500 m³/day clean water (~USD 0.12/m³), 3,500 m³/day wastewater treatment (~USD 0.30/m³), and modern fiber-optic telecommunications. Competitive incentives include a 10% corporate income tax rate for 15 years and import duty exemptions on machinery and raw materials in accordance with regulations. Cost-effective infrastructure and labor enhance long-term investment efficiency.
Key Distances
Ho Chi Minh City: 37 km (expressway), 50 km (NH1A)
My Tho City: 12 km
Hiep Phuoc Port: 45 km
Tan Son Nhat International Airport: 43 km
Internal Transportation
The main internal road is 16 meters wide (4 lanes), complemented by 15-meter green belts on both sides and a 3-meter landscaped median, ensuring smooth and safe container traffic circulation.
The park provides direct connectivity to National Highway 1A (150 meters away) and the Ho Chi Minh City – Trung Luong Expressway, optimizing regional logistics and cargo transportation.
Power Supply System
22kV medium-voltage power supplied by EVN Tien Giang, with a total transformer station capacity of 40MVA, ensuring stable and uninterrupted electricity for large-scale industrial production.
Clean Water Supply
An on-site water plant with a capacity of 15,000 m³/day provides stable water pressure for both production and domestic use.
Wastewater Treatment
A centralized wastewater treatment plant with a capacity of 10,000 m³/day, utilizing modern treatment technology. Treated wastewater meets Vietnamese Column A standards before discharge into the receiving water body.
Electronics & High-Tech
Mechanical Engineering & Supporting Industries
Chemicals & Pharmaceuticals
Textiles & Technical Plastics
Processing & Consumer Manufacturing
Corporate Income Tax (CIT) Incentives
Full exemption from Corporate Income Tax for the first 4 years from the time taxable income is generated, followed by a 50% reduction for the subsequent 9 years.
Land Incentives
Exemption from land/water surface rental fees for up to 15 years, including a 3-year exemption during the basic construction period.
50% reduction of non-agricultural land use tax.
Import Duty Incentives
Pursuant to Decree No. 218/2013/ND-CP (guiding the implementation of the Law on Investment), import duty exemption applies to machinery and equipment used to form fixed assets for new investment projects in industrial parks nationwide.
Building Density & Height
Maximum building density ranges from 60–70% depending on each plot, in compliance with applicable construction regulations.
Factory height is limited to 3–5 floors (15–20 meters), ensuring proper setbacks, ventilation, and operational efficiency.
Power & Water Infrastructure
Power Supply: Designed capacity of 2 x 40 MVA from the 110/22kV Tan Huong Substation, with 22kV lines directly connected to each plot, ensuring reliable and uninterrupted operations.
Clean Water Supply: 15,000 m³/day.
Wastewater Treatment: Centralized plant with total capacity of 4,500 m³/day (Phase 1: 1,500 m³; Phase 2: 3,000 m³), compliant with environmental discharge standards.
Fire Protection System
Fire hydrants installed along internal roads at 150-meter intervals.
Factories are required to install internal sprinkler systems in accordance with TCVN 2622 and obtain approval from provincial fire authorities.
Management fee: 0.4 USD/m² per year, including infrastructure maintenance, security, and sanitation.
Electricity price:
Peak hours: 0.1 USD/kWh
Normal hours: 0.05 USD/kWh
Off-peak hours: 0.03 USD/kWh
Billed monthly, according to the EVN time-of-use tariff (3 time bands), excluding 10% VAT.
Wastewater treatment fee: 0.28 USD/m³, charged according to contract terms, with treated wastewater meeting Column A standards under QCVN 40:2011/BTNMT.
IPAVIETNAM
Hotline/Zalo/WhatsApp: +84-83-555-3388
WeChat ID: fdivietnam
E-mail: support@ipavietnam.org
Contact person:
Mr. Gia Bao, Investment Promotion Officer
Cell phone: +84-941-898-117
E-mail: bao.ipavietnam@gmail.com
Note: We only provide consultancy service and information on industrial parks, industrial clusters, ready built factories to enterprises or investors who contact us directly. We do not exchange information through brokers or other intermediary channels.
No Document!