Planned area: 197,1 ha
Land use term: 50 years (2004 – 2054)
Leasable area: 1 - 5 ha
Leasing price: Negotiation
Project highlights:

Tam Thang Industrial Park is one of the leading investment destinations in the region, recognized for its strategic location and strong operational performance. The park is located adjacent to National Highway 1A, approximately 30 km from Chu Lai Airport and 35 km from Ky Ha Port. The industrial park features synchronized infrastructure developed by Chu Lai Infrastructure Development Company, including a stable power supply, advanced wastewater treatment systems, and wide internal roads that support efficient logistics and production activities. With competitive leasing rates and a building density of 60%, the park is oriented toward an eco-industrial model with diverse clean industries. As part of the Chu Lai Open Economic Zone, investors benefit from the highest level of tax incentives, including a 4-year corporate income tax exemption. The park also offers access to a high-quality yet cost-effective workforce and excellent connectivity to the Thaco automotive–mechanical supply chain. The project also plays an important role in job creation and promoting urban development in the surrounding area.

Site connection

Seaports
Truong Hai Port: 25 km
Ky Ha Port: 35 km
Dung Quat Port: 60 km
Tien Sa Port (Da Nang): 70 km
Airports
Chu Lai Airport: 35 km
Da Nang International Airport: 70 km
Expressway
Adjacent to the Da Nang – Quang Ngai Expressway; about 2.5 km from National Highway 1A.
City Centers
Tam Ky City Center: 6–7 km
Hoi An City: 25 km
Da Nang City: 65–70 km
Railway Station
Tam Ky Railway Station: 6 km
Major Industrial Centers
Bac Chu Lai Industrial Park: approximately 20–25 km away
Close to the THACO Chu Lai Industrial Complex
Labor Supply
Abundant workforce from Tam Ky City and Thang Binh District, located near surrounding residential areas.
Schools & Hospitals
Located within a 5–10 km radius from Tam Ky City, with convenient access to local education and healthcare facilities.

Infrastructure situation

Internal Transportation
The internal road network is fully completed, with wide roads directly connected to National Highway 1A and the expressway, supporting efficient logistics operations. The park also shares and expands infrastructure with Tam Thang Industrial Park 2.
Power Supply System
Electricity is supplied from the Tam Thang 110 kV substation (national grid), ensuring a stable power supply. A 35 kV transmission line is located about 800 m away, while 22 kV power lines run along the internal roads to each land plot.
Water Supply System
Water is provided by the Tam Ky Water Plant, with a capacity of 35,000 m³/day, supplying water 24/7 directly to the factory boundary. The capacity can reach up to 100,000 m³/day when combined with Tam Thang Industrial Park 2.
Wastewater Treatment
A centralized wastewater treatment plant with a capacity of 3,000 m³/day (located in Tam Thang Industrial Park 2). The system features separate drainage pipelines for wastewater and rainwater, ensuring compliance with environmental standards.

Attraction fields

Processing of agricultural, forestry, and seafood products; food processing
Consumer goods manufacturing; garment and textile; export-oriented footwear
Precision mechanical engineering, electronics, and component assembly
Production of construction materials, plastics, and rubber
Handicrafts manufacturing and wood processing
Logistics services and warehousing supporting production

Investment Incentives

Corporate Income Tax (CIT) Incentives
Preferential tax rate: 10% for 15 years (instead of the standard 20%).
Standard sectors/projects
2-year tax exemption, followed by a 50% reduction for the next 4 years.
High-tech projects (certified by the Ministry of Science and Technology):
4-year tax exemption, followed by a 50% reduction for the subsequent 9 years.
Import Duty Incentives
Import duty exemption applies to

Goods forming fixed assets of incentive-eligible investment projects.
Raw materials and components not yet produced domestically (subject to confirmation by the Ministry of Industry and Trade).
Goods used for manufacturing export products (in accordance with Article 16 of Law No. 107/2016/QH13).

Technical information

Building Density
Maximum 60–70% of the total land plot area, ensuring at least 20% allocated for green spaces and water surfaces.
Factory Height
Maximum 25–30 meters (approximately 3–4 floors), in compliance with fire safety regulations and required safety distances.
Fire Prevention and Fighting (PCCC)
Internal roads are at least 20 meters wide, with appropriate spacing between factory buildings.
Fire hydrants are installed in accordance with QCVN standards, ensuring safety for industries classified under hazard levels III–IV.

Related costs

Infrastructure Management Fee
0.25 USD/m²/year (excluding VAT), payable annually. The fee is adjusted every 5 years (approximately +20%).
Wastewater Treatment Fee
Approximately 0.28 USD/m³, based on the local service provider.
Electricity Price
According to EVN Quang Nam:
Peak hours: ~0.10 USD/kWh
Off-peak hours: ~0.03 USD/kWh
Water Price
Approximately 0.4–0.8 USD/m³, supplied from the Tam Ky Water Plant, depending on the period.

Contact information

IPAVIETNAM
Hotline/Zalo/WhatsApp: +84-83-555-3388
WeChat ID: fdivietnam
E-mail: support@ipavietnam.org
Contact person:
Mr. Gia Bao, Investment Promotion Officer
Cell phone: +84-941-898-117
E-mail: bao.ipavietnam@gmail.com
Note: We only provide consultancy service and information on industrial parks, industrial clusters, ready built factories to enterprises or investors who contact us directly. We do not exchange information through brokers or other intermediary channels.

Video

No Video!

Document

No Document!

Other Industrial Parks

See all >>
Tang Loong Industrial Park
Tang Loong Industrial Park
Lao Cai | 1,100 ha | $60 - $70
Dong Banh Industrial Park
Dong Banh Industrial Park
Lang Son | 162 ha | $70 - $80
VSIP Lang Son Industrial Park
VSIP Lang Son Industrial Park
Lang Son | 599.76 ha | $100 - $110
Tan Dan Industrial Park
Tan Dan Industrial Park
Hung Yen | 200 ha | $160 - $170
Yen My Industrial Park
Yen My Industrial Park
Hung Yen | 280 ha | $160 - $170
Industrial Park No. 03 – Hung Yen
Industrial Park No. 03 – Hung Yen
Hung Yen | 159.71 ha | $140 - $150
Yen My II Industrial Park
Yen My II Industrial Park
Hung Yen | 313,5 ha | Negotiation
Industrial Park No. 1 – Phase 1
Industrial Park No. 1 – Phase 1
Hung Yen | 216.17 ha | $150 - $160
Ly Thuong Kiet Industrial Park
Ly Thuong Kiet Industrial Park
Hung Yen | 314.2 ha | $150 - $160
Lac Thinh Industrial Park
Lac Thinh Industrial Park
Phu Tho | 220 ha | $80 - $90
Binh Phu Industrial Park
Binh Phu Industrial Park
Phu Tho | 214.29 ha | $100 - $110
Thanh Ha Industrial Park
Thanh Ha Industrial Park
Phu Tho | 282 ha | $90 - $100