Investment Location Search

Phu Bai industrial Park

26
Slide 0
Slide 1
Slide 2

Phu Bai industrial Park

Location: Hue City
Planned area: ~ 800 ha
Land use term: 50 years
Leasable area: 30 - 50 ha
Leasing price: Negotiation
Project highlights:

Phu Bai Industrial Park (Thua Thien Hue) offers excellent logistics connectivity, making it highly attractive for foreign direct investment (FDI). The park is located about 15 km from Hue and directly adjacent to Phu Bai International Airport (approximately 0–2 km away). It is also about 20 km from Thuan An Port and 40 km from Chan May Port, enabling efficient import–export operations.The industrial park is located along National Highway 1A, close to the North–South Railway, and about 10 km from the Cam Lo – Tuy Loan Expressway, ensuring strong regional connectivity. The surrounding area provides a large labor pool of over 100,000 workers with competitive labor costs. Educational and healthcare facilities are also nearby, including Hue University within 10–15 km and Hue Central Hospital about 12–18 km away. With its strategic position as a logistics gateway of Central Vietnam, well-developed infrastructure, and competitive operating costs, Phu Bai Industrial Park continues to attract significant industrial and FDI projects in the region.

Site connection

Transportation Links
Thuan An Port: 15km; Chan May: 40km.
Cam Lo-Tuy Loan Expressway: Direct access.
​Phu Bai Airport: Adjacent (0-2km).
Hue City center: 15km; Hue Station: 15km.
Labor & Services
Major hub (Chan May IP): ~40km.
​Labor pool: Huong Thuy & Hue (~500K skilled).
​Schools & hospitals: Near airport & Hue (10-15km).

Infrastructure situation

Internal Roads
Main roads 31-54m, internals 19.5m fully built, direct QL1A/airport links.
​Separate stormwater/drainage systems.
​Power & Water
Power: 2x 110/22kV substations (50MVA total).
​Clean water: Phu Bai plant 15,000m³/day, D50 pipes.
​Wastewater 
Centralized plant 2,500m³/day (Column B), full collection.

Attraction fields

Garments, footwear, consumer goods (excl. A-B hazards).
​Electronics assembly, industrial plastics.
Agro-forestry processing, packaged food export.
​Building materials, ceramics & cement.
​Agricultural/industrial machinery fabrication.

Investment Incentives

Corporate Income Tax (CIT) Incentives
Preferential tax rate: 10% for 15 years (instead of the standard 20%).
Standard sectors/projects
2-year tax exemption, followed by a 50% reduction for the next 4 years.
High-tech projects (certified by the Ministry of Science and Technology):
4-year tax exemption, followed by a 50% reduction for the subsequent 9 years.
Import Duty Incentives
Import duty exemption applies to

Goods forming fixed assets of incentive-eligible investment projects.
Raw materials and components not yet produced domestically (subject to confirmation by the Ministry of Industry and Trade).
Goods used for manufacturing export products (in accordance with Article 16 of Law No. 107/2016/QH13).

Technical information

Building Density & Height
Max density: 65% production, ≥20% green/tech.
​Factory height: 4-5 floors (18-22m), 8m/5m setbacks.
Fire Safety
Hydrants every 120m on 31-54m mains, on-site fire station (3 trucks).
​Auto alarms & sprinklers >2,000m² factories.

Related costs

Management & Wastewater Fees
Infrastructure management: 0.35 USD/m²/year (ex-VAT), adjusted every 3 years.
​Wastewater: 7,000-10,000 VND/m³ (~0.28-0.40 USD).
​Power & Water Prices
Industrial electricity: Off-peak 1,200 VND/kWh; normal 2,000 VND; peak 3,500 VND.
​Clean water: 10,000-12,000 VND/m³.

Contact information

IPAVIETNAM
Hotline/Zalo/WhatsApp: +84-83-555-3388
WeChat ID: fdivietnam
E-mail: support@ipavietnam.org
Contact person:
Mr. Gia Bao, Investment Promotion Officer
Cell phone: +84-941-898-117
E-mail: bao.ipavietnam@gmail.com
Note: We only provide consultancy service and information on industrial parks, industrial clusters, ready built factories to enterprises or investors who contact us directly. We do not exchange information through brokers or other intermediary channels.

Video

No Video!

Document

No Document!

Other Industrial Parks

See all >>
Dung Quat Industrial Park
Dung Quat Industrial Park
Quang Tri | > 1300ha | Negotiation
VSIP II Industrial Park, Quang Ngai
VSIP II Industrial Park, Quang Ngai
Quang Ngai | 497,7 ha | Negotiation
Tam Anh Industrial Park – South Korea
Tam Anh Industrial Park – South Korea
Da Nang City | 200ha | Negotiation
Tam Thang Industrial Park
Tam Thang Industrial Park
Da Nang City | 197,1 ha | Negotiation
Van Trung Industrial Park
Van Trung Industrial Park
Bac Ninh | 350 hectares | $110 - $120
Bac Chu Lai Industrial Park
Bac Chu Lai Industrial Park
Da Nang City | 712,69 ha | Negotiation
Phong Dien Viglacera Industrial Park
Phong Dien Viglacera Industrial Park
Hue City | 284 ha | Negotiation
Khu Công nghiệp Quán Ngang
Khu Công nghiệp Quán Ngang
Quang Tri | 321,74ha | Negotiation
Quang Tri QTIP Industrial Park
Quang Tri QTIP Industrial Park
Quang Tri | 481,2 ha | Negotiation
Tay Bac Ho Xa Industrial Park
Tay Bac Ho Xa Industrial Park
Quang Tri | 214,7 ha | Negotiation
Tay Bac Quan Hau Industrial Park
Tay Bac Quan Hau Industrial Park
Quang Tri | 220,82 ha . | Negotiation
Hon La Port Industrial Park
Hon La Port Industrial Park
Quang Tri | 97,58 ha | Negotiation