Investment Location Search

Nhon Hoi A industrial Park

23
Slide 0
Slide 1
Slide 2
Slide 3

Nhon Hoi A industrial Park

Location: Gia Lai
Planned area: 394 ha
Land use term: 50 years (2006 – 2056)
Leasable area: 10 - 20 ha
Leasing price: Negotiation
Project highlights:

Nhơn Hội A Industrial Park (Binh Dinh, Vietnam) spans approximately 394 hectares within the Nhon Hoi Economic Zone, located in Nhon Hoi Commune, Quy Nhon, with an operating period from 2006 to 2056. The park enjoys a strategic location just 6 km from Quy Nhon city center, about 15 km from Quy Nhon Port, and 35 km from Phu Cat Airport, with convenient access to the North–South Expressway. The industrial park offers modern infrastructure, including a 110kV power supply system and a 12,000 m³/day water capacity, supporting a wide range of clean industries such as pharmaceuticals, food processing, textiles, and mechanical manufacturing. Developed by the reputable Sai Gon – Nhon Hoi Industrial Park Joint Stock Company, the project benefits from coastal economic zone incentives, including 4 years of corporate income tax exemption. With abundant, cost-competitive labor and integrated urban services, Nhon Hoi A Industrial Park is a high-potential destination for FDI projects in Central Vietnam.

Site connection

Transportation Connectivity
Quy Nhon Seaport: 8 km.
Phu Cat Airport: 30 km (via National Highway 19B).
North–South Expressway: Nearby connection (via National Highway 1A, National Highway 19).
City Center
Quy Nhon City Center: 6 km.
Dieu Tri Railway Station (North–South Railway): 15 km.
Supporting Resources
Labor Supply: Abundant workforce with over 880,000 people of working age (province population ~1.6 million), many skilled in textiles, garment manufacturing, and wood/seafood processing; 2 universities and 4 vocational colleges nearby.
Major Industrial Centers
Nhon Hoi B Industrial Park: Adjacent.
Becamex Binh Dinh Industrial Park: Regional industrial linkage.

Infrastructure situation

Internal Transportation Infrastructure
Internal roads are 20–65 m wide (H30–XB80 asphalt standard) with a total length of ~30 km; 3 free parking areas covering about 4 ha.
Convenient connections to National Highway 1A, National Highway 19, and the North–South Expressway.
Power Supply System
Substation 110/22kV (2×63 MVA, expandable to 150–200 MVA); 22kV power lines supplied directly to each plot with an independent lighting system.
Power sourced from the national grid via the 220kV Phu Tai substation.
Water Supply & Wastewater Treatment
Clean water: 24,000 m³/day (Phase 1), expandable to 64,000–100,000 m³/day (Phase 2), with fire hydrants installed along main roads.
Wastewater treatment: Shared Nhon Hoi A & B system – 2,000 m³/day meeting QCVN 40:2011 Class B standards, pipeline diameter D300–600 mm; Phase 1 plant 14,000 m³/day, expandable to 53,650 m³/day.

Attraction fields

Pharmaceuticals, functional foods, cosmetics, biotechnology; beverage production and packaging.

Textiles and garments, footwear manufacturing, motorcycle/automobile assembly; agro–forestry–seafood processing, plastics and glass production.

Construction materials, wood processing, furniture manufacturing; supporting industries (components and semi-finished products).

Investment Incentives

Corporate Income Tax (CIT) Incentives
Preferential tax rate: 10% for 15 years (instead of the standard 20%).
Standard sectors/projects
2-year tax exemption, followed by a 50% reduction for the next 4 years.
High-tech projects (certified by the Ministry of Science and Technology):
4-year tax exemption, followed by a 50% reduction for the subsequent 9 years.
Import Duty Incentives
Import duty exemption applies to

Goods forming fixed assets of incentive-eligible investment projects.
Raw materials and components not yet produced domestically (subject to confirmation by the Ministry of Industry and Trade).
Goods used for manufacturing export products (in accordance with Article 16 of Law No. 107/2016/QH13).

Technical information

Construction Density & Building Height
Construction density: 40–60% for industrial zones; up to 70% for mixed-use areas. Land-use coefficient ranges from 1.8–2.5, ensuring efficient land utilization.
Factory building height: 12–25 m (1–4 floors), depending on zoning regulations, with designs that prioritize natural ventilation and operational efficiency.
Fire Prevention & Firefighting System 
Equipped with automatic sprinkler systems and fire hydrants placed within ≤120 m intervals.
High-capacity fire pumps of 2,500 m³/h and hydrant pillars installed along the main water supply network.
Chemical Storage Area
Fire-resistant walls rated REI 120 and automatic foam firefighting systems.
A dedicated 4-hectare fire safety planning zone ensures compliance with industrial safety standards.

Related costs

Infrastructure Management Fee
Covers road maintenance, electricity, water supply, and wastewater treatment.
0.2 USD/m²/year (free for the first 3 years, payable from year 4, VAT excluded).
Electricity & Water Tariffs
Production electricity (EVN – 3 time-of-use tariffs):
Peak hours: 3,076 VND/kWh (~0.12 USD)
Normal hours: 1,685 VND/kWh (~0.07 USD)
Off-peak hours: 1,100 VND/kWh (~0.04 USD)
Clean water: 15,800 VND/m³ (~0.63 USD, VAT excluded).
Wastewater Treatment Fee
Based on COD concentration levels:
COD ≤75: 5,121 VND/m³ (~0.20 USD)
COD ≤150: 6,091 VND/m³
COD 151–200: 10,446 VND/m³
COD 201–300: 15,669 VND/m³
COD >300: higher rates apply depending on concentration

Contact information

IPAVIETNAM
Hotline/Zalo/WhatsApp: +84-83-555-3388
WeChat ID: fdivietnam
E-mail: support@ipavietnam.org
Contact person:
Mr. Gia Bao, Investment Promotion Officer
Cell phone: +84-941-898-117
E-mail: bao.ipavietnam@gmail.com
Note: We only provide consultancy service and information on industrial parks, industrial clusters, ready built factories to enterprises or investors who contact us directly. We do not exchange information through brokers or other intermediary channels.

Video

No Video!

Document

No Document!

Other Industrial Parks

See all >>
Dung Quat Industrial Park
Dung Quat Industrial Park
Quang Tri | > 1300ha | Negotiation
VSIP II Industrial Park, Quang Ngai
VSIP II Industrial Park, Quang Ngai
Quang Ngai | 497,7 ha | Negotiation
Tam Anh Industrial Park – South Korea
Tam Anh Industrial Park – South Korea
Da Nang City | 200ha | Negotiation
Tam Thang Industrial Park
Tam Thang Industrial Park
Da Nang City | 197,1 ha | Negotiation
Van Trung Industrial Park
Van Trung Industrial Park
Bac Ninh | 350 hectares | $110 - $120
Bac Chu Lai Industrial Park
Bac Chu Lai Industrial Park
Da Nang City | 712,69 ha | Negotiation
Phu Bai industrial Park
Phu Bai industrial Park
Hue City | ~ 800 ha | Negotiation
Phong Dien Viglacera Industrial Park
Phong Dien Viglacera Industrial Park
Hue City | 284 ha | Negotiation
Khu Công nghiệp Quán Ngang
Khu Công nghiệp Quán Ngang
Quang Tri | 321,74ha | Negotiation
Quang Tri QTIP Industrial Park
Quang Tri QTIP Industrial Park
Quang Tri | 481,2 ha | Negotiation
Tay Bac Ho Xa Industrial Park
Tay Bac Ho Xa Industrial Park
Quang Tri | 214,7 ha | Negotiation
Tay Bac Quan Hau Industrial Park
Tay Bac Quan Hau Industrial Park
Quang Tri | 220,82 ha . | Negotiation