Investment Location Search

My Tho Industrial Park

21
Slide 0
Slide 1
Slide 2

My Tho Industrial Park

Location: Dong Thap
Planned area: 79,14 ha
Land use term: 50 years (1997 – 2047)
Leasable area: 1 - 5 ha
Leasing price: Negotiation
Project highlights:

Strategically located along the Tien River, My Tho Industrial Park is 72 km from Ho Chi Minh City via expressway and only 4 km from National Highway 1A, offering efficient logistics for agro and seafood exports. Operational since 1997, the park features fully developed infrastructure including 16–27m internal roads (4–6 lanes), 110/22kV power supply, 5,000 m³/day clean water capacity, 3,500 m³/day wastewater treatment meeting Column A standards, and fire hydrants at 150-meter intervals. With 28 active enterprises and high occupancy, competitive land costs, and attractive tax incentives, My Tho IP presents a strong value proposition for export-oriented, labor-intensive FDI projects.

Site connection

Key Connectivity Distances
My Tho City Center: ~3 km
National Highway 1A: ~4 km
Ho Chi Minh City: ~72 km
Saigon Railway Station: ~60 km
Hiep Phuoc Port: ~60 km
Saigon Port: ~80 km
Tan Son Nhat International Airport: ~86 km

Infrastructure situation

Internal Roads
Main boulevard: 26–27m wide (6 lanes), 2–3m median.
Internal roads: 16m wide (4 lanes), 3m green strip, 15m sidewalks.
Power Supply
110/22kV power source from EVN Tien Giang along National Highway 1A. Investors develop on-site substations and internal grid systems based on capacity requirements.
Clean Water
5,000 m³/day capacity ensuring stable supply.
Wastewater Treatment
Centralized plant with 3,500 m³/day capacity, compliant with Column A – QCVN 40:2011/BTNMT standards.
Telecommunications & Fire Protection
International-standard telecom infrastructure. Fire hydrants installed at 150-meter intervals, integrated with the park’s water supply system.

Attraction fields

Food Processing: Animal feed, seafood exports, agro-products, rice paper, beverages.
Supporting Industries: PP packaging production, cold storage and preservation logistics.
Textiles & Garments: Manufacturing and export-oriented garment processing.
Construction Materials: Ready-mix concrete and infrastructure-related products.
Shipbuilding & Marine Engineering: Construction and maintenance of inland waterway vessels.

Investment Incentives

Corporate Income Tax (CIT) Incentives
Incentive period: 15 years from the time taxable revenue is generated.
Preferential tax rate: A fixed 10% throughout the entire incentive period.
Details:
First 4 years: Full exemption from corporate income tax (from the year taxable profits are generated).
Next 9 years: 50% reduction of the payable corporate income tax.

Technical information

Planning Parameters
Building Density: Up to 60% of plot area (factory zone ~61.63 ha).
Building Height: Flexible to suit production lines, typically 1–7 floors.
Setback: Minimum 4 meters from plot boundary.
Green & Landscape Area: At least 30% of each plot, ensuring a sustainable industrial environment.
Technical Infrastructure
Power Supply: Provided from the 110/22kV EVN substation along National Highway 1A; investors develop internal distribution systems based on capacity needs.
Clean Water: Approx. 5,000 m³/day, ensuring reliable operations.
Wastewater Treatment: Centralized plant with 3,500 m³/day capacity, compliant with QCVN 40:2011/BTNMT – Column A standards.
Fire Protection: Hydrants installed at 150-meter intervals, directly integrated with the park’s water supply network.

Related costs

Infrastructure Management Fee
USD 0.4/m²/year (~USD 0.03/m²/month), covering internal road maintenance, security, and landscaping.
Electricity Tariff
Applied according to EVN time-of-use rates (excluding VAT):
Peak hours: ~USD 0.10/kWh
Normal hours: ~USD 0.05/kWh
Off-peak hours: ~USD 0.03/kWh
Clean Water
Approximately USD 0.4/m³, supplied by the Tien Giang water system (5,000 m³/day capacity).
Wastewater Treatment Fee
Approximately USD 0.28/m³ (as per contract); treated effluent complies with QCVN 40:2011 – Column A standards.

Contact information

IPAVIETNAM
Hotline/Zalo/WhatsApp: +84-83-555-3388
WeChat ID: fdivietnam
E-mail: support@ipavietnam.org
Contact person:
Mr. Gia Bao, Investment Promotion Officer
Cell phone: +84-941898117
E-mail: giabao.ipavietnam@gmail.com

Video

No Video!

Document

No Document!

Other Industrial Parks

See all >>
Trang Due 3 Industrial Park
Trang Due 3 Industrial Park
Hai Phong City | 652.73 ha | Negotiation
Tien Lang Airport Industrial Park – Zone B
Tien Lang Airport Industrial Park – Zone B
Hai Phong City | 186.49 hectares | $120 - $130
Hanoi Southern Supporting Industrial Park (HANSSIP)
Hanoi Southern Supporting Industrial Park (HANSSIP)
Hanoi City | 640 ha | Negotiation
Dai Ngai Industrial Park
Dai Ngai Industrial Park
Can Tho City | 200 ha | Negotiation
Binh Dinh Becamex VSIP Industrial Park
Binh Dinh Becamex VSIP Industrial Park
Gia Lai | 1.374 ha (1000 ha IP, 374 ha C&R) | Negotiation
Xuan Cam – Huong Lam Industrial Park
Xuan Cam – Huong Lam Industrial Park
Bac Ninh | 224.02 ha (Phase 1: 102.85 ha – Phase 2: 121.17 ha) | $70 - $80
Tien Son – Ninh Son Industrial Park
Tien Son – Ninh Son Industrial Park
Bac Ninh | ~222.98 ha (phase 1: 89.57 ha; phase 2 planned ~133.41 ha) | Negotiation
Que Vo II Industrial Park – Phase 2
Que Vo II Industrial Park – Phase 2
Bac Ninh | ~285.67 ha (industrial land ~277.64 ha) | $130 - $140
Tran De Industrial Park
Tran De Industrial Park
Can Tho City | 160 ha | < $60
Cha La Industrial Park
Cha La Industrial Park
Tay Ninh | 42,19 ha | Negotiation
Bim Son B Industrial Park
Bim Son B Industrial Park
Thanh Hoa | 216.29ha | $60 - $70
Thanh Thanh Cong Industrial Park
Thanh Thanh Cong Industrial Park
Tay Ninh | 760 ha | Negotiation