Investment Location Search

Ledana Industrial Park

28
Slide 0
Slide 1
Slide 2

Ledana Industrial Park

Location: Dong Nai
Planned area: 424,54 ha
Land use term: 50 years (2021 - 2071)
Leasable area: 20 - 30 ha
Leasing price: Negotiation
Project highlights:

Ledana Industrial Park (Binh Phuoc) stands out with strategic location near Hoa Lư Border Gate (1.5km), direct access to National Highway 13 and Ho Chi Minh-Chon Thanh Expressway, just 120km from Tan Son Nhat Airport. Unique specialized IP for high-pollution sectors like textiles and metallurgy, backed by 12,000m³/day advanced wastewater treatment (Column A standard). Synchronous infrastructure (110kV power, 17,000m³/day water), competitive costs (electricity 0.03-0.1 USD/kWh, management 0.4 USD/m²/year), abundant low-cost labor. 30-60% occupancy, primed for Asian FDI amid border growth boom.

Site connection

Transportation Links
To Hoa Lư Border Gate: 1.5 km.
To National Highway 13: 1 km.
​To Ho Chi Minh - Chon Thanh Expressway: Direct via QL13.
​To Tan Son Nhat Airport: 120-130 km.
To Long Thanh Airport: 130 km.
​Logistics Connections
To Dau Tieng Port: 30 km.
To Dong Nai Port: 80-90 km.
To HCM City Port Group (VICT, ICD Phuoc Long): ~150 km.
​To Cai Mep Port: 200 km.

Infrastructure situation

Internal Road Network
Internal roads 22-38m wide, fire hydrants every 150m, upgrading local paths from dirt to concrete.Direct links to National Highway 13 and Ho Chi Minh - Chon Thanh Expressway.
​Utilities: Power & Water
Power: National grid with dedicated substations for reliability.
​Water: 4,500 m³/day capacity; centralized wastewater treatment for high-pollution sectors (textiles, metallurgy).
Waste & Amenities
Advanced wastewater plant for polluting industries; 20% green space.
​Fiber optic internet (VNPT/Viettel); Phase 1 (329.5 ha) prioritized.

Attraction fields

Textile, dyeing, leather, footwear, and garment industries.
Metallurgy, equipment manufacturing, metals, and related fields.

Investment Incentives

Corporate Income Tax (CIT) Incentives
Preferential tax rate: 10% for 15 years (instead of the standard 20%).
Standard sectors/projects
2-year tax exemption, followed by a 50% reduction for the next 4 years.
High-tech projects (certified by the Ministry of Science and Technology):
4-year tax exemption, followed by a 50% reduction for the subsequent 9 years.
Import Duty Incentives
Import duty exemption applies to

Goods forming fixed assets of incentive-eligible investment projects.
Raw materials and components not yet produced domestically (subject to confirmation by the Ministry of Industry and Trade).
Goods used for manufacturing export products (in accordance with Article 16 of Law No. 107/2016/QH13).

Technical information

Building Density & Height
Max building density: 60-70% (production land), 20% for green space and social facilities.
Factory height: Up to 24-36m per functional zone, with safe setbacks from residential areas.
Design Capacities
Power: 110/22kV substation, 2x40MVA; stable supply 2-3 MW/ha.
Clean water: 17,000 m³/day.night (30 m³/ha.day industrial); ≥80% wastewater collection.
Wastewater treatment: 12,000 m³/day.night, Column A TCVN 40:2011 compliant (advanced microbial).
Fire Safety
Fire hydrants every 150m per TCVN 6379-1998, at intersections and along internal roads.
​Full PCCC systems for high-risk sectors (metallurgy, textiles).

Related costs

Management & Wastewater Fees
Infrastructure management fee: 0.4 USD/m²/year.
​Wastewater treatment fee: 0.28 USD/m³.
​Power & Water Prices
Electricity: 0.03 - 0.1 USD/kWh (varies by normal/off-peak/peak hours per EVN).
Clean water: 0.4 USD/m³.

Contact information

IPAVIETNAM
Hotline/Zalo/WhatsApp: +84-83-555-3388
WeChat ID: fdivietnam
E-mail: support@ipavietnam.org
Contact person:
Mr. Gia Bao, Investment Promotion Officer
Cell phone: +84-941-898-117
E-mail: bao.ipavietnam@gmail.com
Note: We only provide consultancy service and information on industrial parks, industrial clusters, ready built factories to enterprises or investors who contact us directly. We do not exchange information through brokers or other intermediary channels.

Video

No Video!

Document

No Document!

Other Industrial Parks

See all >>
Minh Hung Sikico Industrial Park
Minh Hung Sikico Industrial Park
Dong Nai | 655 ha | Negotiation
Viet Kieu Industrial Park
Viet Kieu Industrial Park
Dong Nai | 103,9 ha | Negotiation
Minh Hung – South Korea Industrial Park
Minh Hung – South Korea Industrial Park
Dong Nai | 392,28 ha (Phase I: 192,28 ha; Phase II: 200 ha) | Negotiation
Thai Dao - Tan An Industrial Park
Thai Dao - Tan An Industrial Park
Bac Ninh | 166.87 hectares | Negotiation
Chon Thanh 1 Industrial Park
Chon Thanh 1 Industrial Park
Dong Nai | 120 ha | Negotiation
My Thai Industrial Park
My Thai Industrial Park
Bac Ninh | 159,97 ha | $120 - $130
Giang Dien Industrial Park
Giang Dien Industrial Park
Dong Nai | 529,2 ha | Negotiation
Ho Nai Industrial Park
Ho Nai Industrial Park
Dong Nai | 497 ha | Negotiation
Song Mai – Nghia Trung Industrial Park
Song Mai – Nghia Trung Industrial Park
Bac Ninh | 197.1 ha | $130 - $140
Bau Xeo Industrial Park
Bau Xeo Industrial Park
Dong Nai | 499,8 ha | Negotiation
Yen Lu Industrial Park (Expansion)
Yen Lu Industrial Park (Expansion)
Bac Ninh | 119.83 ha | Negotiation
Nghia Hung Industrial Park
Nghia Hung Industrial Park
Bac Ninh | 148.68 ha | $80 - $90