Please Login to use our services.
If you are not our member, please register here or contact us via email support@ipavietnam.org for our further support.
Industrial Park No. 5 – Hung Yen is strategically located in An Thi and Kim Dong districts, adjacent to key transport corridors, optimizing logistics costs and regional connectivity. Covering over 192 hectares with developed technical infrastructure such as wide internal roads, reliable power and water supply, and wastewater treatment systems, the park is designed to support manufacturing operations. The park focuses on attracting electronics, precision mechanics, and light industry sectors in line with provincial industrial planning, benefiting from a large labor pool and competitive operating costs in Hung Yen. With attractive investment incentives and strong regional linkage, Industrial Park No. 5 is an appealing destination for both domestic and foreign investors.
Located at a prime position along the corridor connecting the Hanoi – Hai Phong Expressway and the Phap Van – Cau Gie Expressway, approximately 4 km from Yen My Interchange.
Travel time to Noi Bai International Airport, seaports, and Hanoi is about 1 hour by car.
Approximately 40 km from Hanoi city center
Approximately 90 km from Hai Phong
Approximately 50 km from Hai Duong
Approximately 60 km from Noi Bai International Airport
Approximately 4 km from the Hanoi – Hai Phong Expressway
In terms of railway connectivity, approximately 25 km from Lac Dao Railway Station and 28 km from Tuan Luong Railway Station
Borders Bac Ninh to the north, Thai Binh to the south, and Ha Nam to the west
Hung Yen Industrial Park No. 5 features well-invested and comprehensively developed infrastructure, with factory areas arranged at appropriate distances and locations. The internal traffic system is convenient, featuring main road axes with widths of 46 m, 34 m, and 23 m.
The industrial park is fully equipped with essential utilities, including a reliable power supply system for production and a safe water supply system that meets the operational demands of enterprises.
The wastewater treatment system is properly planned and operated in compliance with applicable technical and environmental standards.
Electrical and electronics industries, high-tech industries, construction materials and mechanical engineering, pharmaceuticals, cosmetics, food processing, light industry, consumer goods, etc.
Maximum construction density: 70%
Maximum building height: 5 floors
Land sublease price (including infrastructure): ~USD 125/m²
Infrastructure management fee: ~USD 0.7/m²/year
Electricity (110kV):
- Normal hours: $0.06/kWh
- Off-peak: $0.04/kWh
- Peak hours: $0.11/kWh
Water: ~ $0.53/m³
Wastewater treatment: ~ $0.45/m³
IPAVIETNAM
Hotline/Zalo/WhatsApp: +84-83-555-3388
WeChat ID: fdivietnam
E-mail: support@ipavietnam.org
Contact person:
Ms. Thanh An, Investment Promotion Officer
Cell phone: +84-397-061-299
E-mail: an.ipavietnam@gmail.com
Note: We only provide consultancy service and information on industrial parks, industrial clusters, ready built factories to enterprises or investors who contact us directly. We do not exchange information through brokers or other intermediary channels.
No Document!