Investment Location Search

Hoa Mac

1354 Medal icon
Slide 0

IP048HM

Total area: 203 ha
Period: 2008-2058
Leasable area: 10 - 20 ha
Leasing price: $60 - $70
Location:

Site connection

Adjacent to Highway 38
5 km from Phap Van - Ninh Binh highway
7 km from North - South railway
50 km from Hanoi
70 km from Noi Bai airport  
83 km from Hai Phong port.

Infrastructure situation

Power supply:
- The power supply is from 110 / 35KV transformer station 1.5km from the Industrial Park through 35KV-25MVA distribution station in the Industrial Park.
Water supply
- Moc Nam water plant (3km from the Industrial Park) with a total capacity of 12,000m3 / day-night.
- Clean water is provided to the fence of the land lots
Drainage:
- Rainwater and wastewater drainage systems (industrial and domestic wastewater) are built separately.
Waste water & waste treatment:
- The wastewater treatment plant is built with a capacity of 5,000 m3 / day and night, using a biological treatment system.
- Solid waste from factories will be sorted, collected on site and transported to transfer stations in the industrial park for gathering before being transported to other places for treatment.
Telephone / Internet:
Telecommunication system meets international standards and is available to meet the needs of communication, high speed data transmission and domestic and international postal services. Underground optical cable system is directly connected to the fence of each enterprise.

Attraction fields

315,319,317,466,465,

Related costs

1. Electricity:
- Normal hours:  0.07 USD/Kwh
- Night hours:  0.045 USD/Kwh
- Rush hours: 0.119 USD/Kwh
 (excluded VAT)
2. Water Supply: 0.53 USD/m3 excluded V.A.T - monthly payment.
3. Water treatment: 0.5USD/m3 excluded VAT
4. Management Fee: 
unit: 0.35-0,4 USD /㎡/year, excluded VAT

Incentives

CIT rate:  20%
Exempt CIT for the first two years and decrease 50% for the next four years on the incoming of enterprise that implements new investment project in the Industrial Parks (pursuant to Decree No. 218/2013/ND-CP dated December 26, 2013 that issued by Government regulates and guide the implementation of Corporate Income Tax - applied from February 15, 2014).

Major tenants

AMV, Dorco Vina, Elite group,…

Contact information

IPAVIETNAM
Hotline: +84-98-369-3699 | +84-83-555-3388
Email: support@ipavietnam.org​

Document

No Document!

Others Industrial Park & Cluster

See all >>
Duc Tho Industrial Cluster
Duc Tho Industrial Cluster
Ha Tinh | 68.1 ha | < $60
Doan Tung 2 Industrial Cluster
Doan Tung 2 Industrial Cluster
Updating... | 46.8 ha | $80 - $90
Khanh Thuong Industrial Cluster
Khanh Thuong Industrial Cluster
Ninh Binh | 75 ha | Negotiation
Nenh Industrial Cluster
Nenh Industrial Cluster
Updating... | Updating... | $110 - $120
Le Mont Xuan Phuong Industrial Cluster
Le Mont Xuan Phuong Industrial Cluster
Thai Nguyen | 75 ha | Negotiation
Khanh Loi Industrial Cluster
Khanh Loi Industrial Cluster
Ninh Binh | 63 ha | Negotiation
Plateformes Industrielles du Congo (PIC)
Plateformes Industrielles du Congo (PIC)
Updating... | 2,700 ha | Negotiation
ZONES INDUSTRIELLES DE CÔTE D’IVOIRE (ZIC)
ZONES INDUSTRIELLES DE CÔTE D’IVOIRE (ZIC)
Updating... | 920 ha | Negotiation
Congo Industrial Platforms (CIP)
Congo Industrial Platforms (CIP)
Updating... | 528 ha (phase 1) | Negotiation
Glo-Djigbé Industrial Zone (GDIZ)
Glo-Djigbé Industrial Zone (GDIZ)
Updating... | 16,400,000 m² | Negotiation
Adétikopé Industrial Platform (PIA)
Adétikopé Industrial Platform (PIA)
Updating... | 10,620,000m² | Negotiation
Gabon Special Economic Zone (GSEZ)
Gabon Special Economic Zone (GSEZ)
Updating... | 1,126 ha | Negotiation
DMCA.com Protection Status