Please Login to use our services.
If you are not our member, please register here or contact us via email support@ipavietnam.org for our further support.
Ho Nai Industrial Park stands out thanks to its strategic location in Dong Nai Province, with convenient connectivity just 2–10 km from Bien Hoa City center, 20 km from the Long Thanh – Dau Giay Expressway, and approximately 40 km from Tan Son Nhat International Airport and Cat Lai Port, providing significant logistics advantages for import and export activities. The infrastructure is modern and fully synchronized, featuring internal roads 24–45 m wide, a 220kV power supply system (80MVA), clean water capacity of 200,000 m³/day, and a centralized wastewater treatment plant with a capacity of 7,000 m³/day meeting environmental standards, ensuring continuous and environmentally friendly production. The park has attracted over 130 FDI enterprises, including Hansol, Brother, and Nestlé, with access to a local labor force of over 3 million people.
Transportation Advantages
Approximately 1–1.5 km from National Highway 1A, providing direct connection to the North–South corridor.
About 2–10 km from Bien Hoa City.
Around 40 km from Ho Chi Minh City (about 60 minutes by car).
Approximately 20–30 km from Long Thanh International Airport.
Around 40 km from Cat Lai Port.
About 60 km from Cai Mep – Thi Vai deep-water port complex.
Logistics & Infrastructure Connectivity
Close to the Bien Hoa bypass road (about 2 km) and National Highway 51 (about 5 km).
Convenient access to a multimodal transport network including highways, seaports, airports, and the planned North–South railway connection.
Suitable for manufacturing, export-oriented industries, and supporting industries.
Workforce & Amenities
Abundant labor supply from Dong Nai Province, with a population of over 3 million people.
Residential areas, schools, and hospitals within a radius of about 3–10 km.
Infrastructure
Internal Transportation
Main roads: 40–45 m wide (12–15 m carriageway, asphalt/concrete surface); internal roads: 24–28 m wide (8–12 m carriageway), directly connected to National Highway 1A and Bien Hoa Bypass Road. Fully completed infrastructure supports efficient cargo transportation.
Power Supply
Power sourced from a 220/22kV substation (40MVA, Dong Nai Power Company), planned upgrade to 80MVA; supplemented by a 110/22kV substation via four stable medium-voltage lines, ensuring continuous supply for over 110 enterprises.
Water Supply
Supplied by Long Binh Water Plant (Bien Hoa) with a capacity of 200,000 m³/day, operated by Dong Nai Water Supply Construction Company, ensuring stable production supply.
Wastewater Treatment
Centralized wastewater treatment plant (Phase 2 completed) with a capacity of 7,000 m³/day, meeting environmental standards for all enterprises in the park. Dong Nai Province enforces strict environmental monitoring compliance.
Electronics manufacturing and assembly
Food processing
Mechanical engineering, machinery manufacturing, and supporting industries
Garment and light industries
Plastics and auxiliary chemicals
Household appliances, electronics, refrigeration
Flavorings, cosmetics, pharmaceuticals materials
Construction materials, interior equipment, wood manufacturing
Corporate Income Tax (CIT) Incentives
Preferential tax rate: 10% for 15 years (instead of the standard 20%).
Standard sectors/projects
2-year tax exemption, followed by a 50% reduction for the next 4 years.
High-tech projects (certified by the Ministry of Science and Technology):
4-year tax exemption, followed by a 50% reduction for the subsequent 9 years.
Import Duty Incentives
Import duty exemption applies to
Goods forming fixed assets of incentive-eligible investment projects.
Raw materials and components not yet produced domestically (subject to confirmation by the Ministry of Industry and Trade).
Goods used for manufacturing export products (in accordance with Article 16 of Law No. 107/2016/QH13).
Construction Density & Height
Maximum net construction density: 70% (for 1–5 floor factories/warehouses); reduced to 60% if over 5 production floors
Maximum building height: not exceeding 45 m near airport areas; measured from the lowest ground elevation of the plot
Utilities Capacity
Power: 220/22kV substation (40–80MVA)
Clean water: 200,000 m³/day from Long Binh Plant
Wastewater treatment: 7,000 m³/day, meeting QCVN 40:2011/BTNMT standards
Fire Prevention & Fighting (FPF)
Internal roads 24–45 m wide support fire trucks; safety distance between buildings must comply with TCVN 2622:1995; fire hydrants located within 150 m of factories. FPF approval required prior to construction under Decree 136/2020/ND-CP.
Infrastructure Management Fee
Management & maintenance: 0.4–0.75 USD/m²/year (excluding VAT)
Common infrastructure usage: approximately 2.2 USD/m²/year (based on previous reports)
Wastewater Treatment Fee
Minimum 0.45 USD/m³ (excluding VAT), calculated based on 80% of clean water consumption
Electricity & Water Rates
Production electricity: 0.03–0.1 USD/kWh (depending on peak/off-peak hours, as regulated by Dong Nai EVN)
Clean water: 0.4 USD/m³ from Long Binh Water Plant
GS Battery Vietnam Co., Ltd. (Korea) – Battery manufacturing
Storsack Vietnam Co., Ltd. – Packaging
Tin Dung Vietnam Co., Ltd. – Component manufacturing
Broad Bright Industrial Co., Ltd. (Taiwan) – Precision mechanics
Kenda Rubber (Vietnam) Co., Ltd. (Taiwan) – Rubber and tires
Sanlife Vietnam Co., Ltd. – Plastics and plastic products
Sunshine (Tonk Wheel) Industrial Co., Ltd. (China) – Automotive components
IPAVIETNAM
Hotline/Zalo/WhatsApp: +84-83-555-3388
WeChat ID: fdivietnam
E-mail: support@ipavietnam.org
Contact person:
Mr. Gia Bao, Investment Promotion Officer
Cell phone: +84-941898117
E-mail: bao.ipavietnam@gmail.com
Note: We only provide consultancy service and information on industrial parks, industrial clusters, ready built factories to enterprises or investors who contact us directly. We do not exchange information through brokers or other intermediary channels.
No Document!