Investment Location Search

Ha Vang Industrial Park

20
Slide 0
Slide 1
Slide 2

Ha Vang Industrial Park

Location: Ha Tinh
Planned area: 250 ha.
Land use term: 50 years (2006-2056)
Leasable area: 5 - 10 ha
Leasing price: Negotiation
Project highlights:

Ha Vang Industrial Park is a high-potential development project in Ha Tinh Province. The project features synchronous infrastructure with digitalized management systems, advanced wastewater treatment, and prioritizes multi-sector green industries. After 12 years of preparation, the project is now being actively implemented by the Ha Tinh Economic Zone Authority, ensuring clear legal status and strong community consensus. The park benefits from attractive tax incentives from Ha Tinh Province, along with an abundant and cost-effective labor force, contributing to rapid local budget growth. It is ideal for industries such as mechanical engineering, processing and manufacturing, and electronics, while also promoting the economic development of Can Loc District and surrounding areas. With limited industrial land supply in the region, Ha Vang Industrial Park offers strong investment returns with relatively low risk for investors.

Site connection

Transportation Connectivity
My Thuy Port: Nearby (exact distance not yet confirmed, < 50 km)
Da Nang Port: 168 km
North–South Expressway: Approximately 20 km (connected via National Highway 1A)
Vinh International Airport: 50 km
National Highway 1A: Located adjacent to the industrial park
Services & Human Resources
Ha Tinh City Center: 20 km
Vinh City Center: 30 km
Abundant labor force: From the densely populated Can Loc District
Schools & hospitals: Located near Can Loc District center.

Infrastructure situation

Internal Transportation
Planned main roads with 4–6 lanes and branch roads with 2 lanes (not yet constructed).
Connected to National Highway 1A and National Highway 8A, with external transport infrastructure already available.
Power Supply System
Electricity sourced from the national power grid (specific connection to the industrial park has not yet been completed).
Designed to meet industrial production demand once the infrastructure is fully completed.
Water Supply
A clean water plant is planned with a design capacity of 2,000 m³/day (not yet constructed).
Additional water source from the Nghen River, located approximately 500 meters away.
Wastewater Treatment
Planned centralized wastewater treatment plant with a capacity of 15,000 m³/day, designed according to industrial wastewater treatment standards.

Attraction fields

Industrial park infrastructure development
Agro–forestry and seafood processing
Assembly, mechanical engineering, and component manufacturing
Electrical and electronics manufacturing
Building materials production
Consumer goods and household appliance manufacturing

Investment Incentives

Corporate Income Tax (CIT) Incentives
Preferential tax rate: 10% for 15 years (instead of the standard 20%).
Standard sectors/projects
2-year tax exemption, followed by a 50% reduction for the next 4 years.
High-tech projects (certified by the Ministry of Science and Technology):
4-year tax exemption, followed by a 50% reduction for the subsequent 9 years.
Import Duty Incentives
Import duty exemption applies to

Goods forming fixed assets of incentive-eligible investment projects.
Raw materials and components not yet produced domestically (subject to confirmation by the Ministry of Industry and Trade).
Goods used for manufacturing export products (in accordance with Article 16 of Law No. 107/2016/QH13).

Technical information

Building Density
Factory/Warehouse construction density: 60–70% of the land plot area.
Technical infrastructure areas (waste treatment, fire protection, etc.): Maximum 60%.
Factory Building Height
Factories and warehouses: Maximum 5 floors.
Building setback: At least 6 meters from the land plot boundary.
Fire Protection and Fighting (PCCC)
Fire hydrants installed along internal roads.
The system complies with national fire safety standards and includes booster pumps to ensure adequate firefighting water pressure.

Related costs

Infrastructure & Management Fees
Management fee: 0.2 USD/m²/year.
Basic Utilities
Electricity price: 0.03–0.10 USD/kWh (off-peak to peak hours).
Clean water price: 0.40 USD/m³ (based on metered consumption).
Wastewater treatment fee: 0.28 USD/m³.

Contact information

IPAVIETNAM
Hotline/Zalo/WhatsApp: +84-83-555-3388
WeChat ID: fdivietnam
E-mail: support@ipavietnam.org
Contact person:
Mr. Gia Bao, Investment Promotion Officer
Cell phone: +84-941-898-117
E-mail: bao.ipavietnam@gmail.com
Note: We only provide consultancy service and information on industrial parks, industrial clusters, ready built factories to enterprises or investors who contact us directly. We do not exchange information through brokers or other intermediary channels.

Video

No Video!

Document

No Document!

Other Industrial Parks

See all >>
Hon La Port Industrial Park
Hon La Port Industrial Park
Quang Tri | 97,58 ha | Negotiation
Bang Industrial Park
Bang Industrial Park
Quang Tri | 450 ha | Negotiation
Bac Dong Hoi Industrial Park
Bac Dong Hoi Industrial Park
Quang Tri | 134.95 ha | Negotiation
Cam Lien Industrial Park
Cam Lien Industrial Park
Quang Tri | 450 ha | Negotiation
Bac Thach Ha industrial Park
Bac Thach Ha industrial Park
Ha Tinh | 190,41 ha | Negotiation
Tho Loc Industrial Park
Tho Loc Industrial Park
Nghe An | 1.159,71 ha | Negotiation
Hoang Mai II Industrial Park
Hoang Mai II Industrial Park
Nghe An | 343,69 ha | Negotiation
Hoang Mai I Industrial Park
Hoang Mai I Industrial Park
Nghe An | 264,77 ha | Negotiation
VSIP Nghe An II Industrial Park
VSIP Nghe An II Industrial Park
Nghe An | 500 ha | Negotiation
Ngoc Lac industrial Park
Ngoc Lac industrial Park
Thanh Hoa | 150 ha | Negotiation
Industrial Parrk No.3
Industrial Parrk No.3
Thanh Hoa | 247,12 ha | Negotiation
Lam Son - Sao Vang industrial Park
Lam Son - Sao Vang industrial Park
Thanh Hoa | 537,3 ha | Negotiation