Dung Quat Industrial Park (Quang Ngai) – the core zone of Dung Quat Economic Zone – stands out with a total area of 1,303 ha (Phase 1: 319 ha) and a strategic location in Binh Thanh Commune, Binh Son District. The park is only 2 km from Dung Quat Deep-Sea Port, 30 km from Chu Lai International Airport, and well connected to National Highway 1A and the North–South railway, enabling efficient domestic and international logistics. The industrial park features modern, synchronized infrastructure designed for multi-sector industries including petrochemical refining, metallurgy, heavy engineering, chemicals, and renewable energy. Developed by the reputable investor Hoang Thinh Dat, it offers strong advantages such as coastal economic zone incentives (4-year corporate tax exemption and 50% reduction for the following years), competitive land costs, and a large workforce of over 50,000 workers. Supported by a strong FDI ecosystem including Dung Quat Refinery and major steel projects, the park is an ideal destination for large-scale industrial investments in Central Vietnam.
Dung Quat International Seaport: 3–10 km
Chu Lai International Airport: 5 km
Da Nang – Quang Ngai Expressway: 1 km
Quang Ngai City Center: 32 km
Da Nang City Center: 100 km
Major Industrial Hub: Located near VSIP Quang Ngai Industrial Park and VSIP II, home to dozens of enterprises with more than 44 investment projects, forming a strong regional industrial ecosystem.
Internal Transportation Infrastructure
Internal roads 22–33 m wide (2–4 lanes), ensuring smooth connectivity throughout the industrial park.
Ongoing upgrades to sidewalks, drainage systems, and lighting under a VND 350 billion infrastructure project, addressing potholes and flooding.
Direct connectivity to expressways, seaports, and airports, ensuring efficient logistics and cargo transportation.
Power Supply
Electricity supplied by EVN Quang Ngai via the 500kV and 220kV national grid.
110/22kV substation (2×63 MVA) operating in Phase 1, with additional substations planned for Phase 2.
Electricity price follows EVN tariff framework: approximately USD 0.05–0.13/kWh.
Water Supply & Wastewater Treatment
Clean water plant capacity: 31,000–50,000 m³/day, sourced from Thach Nham B3 canal, with priority supply for Dung Quat 2 projects.
Wastewater treatment capacity: 25,000–51,000 m³/day (Phase 1–2), meeting Vietnam Class B environmental standards.
New wastewater collection and drainage system project under development to further improve environmental infrastructure.
Mechanical manufacturing, industrial equipment fabrication.
Food and agricultural product processing.
Logistics, warehousing, and industrial support services.
Petrochemical refining, renewable energy (regional growth nuclear power).
High technology, new materials manufacturing.
Corporate Income Tax (CIT) Incentives
Preferential tax rate: 10% for 15 years (instead of the standard 20%).
Standard sectors/projects
2-year tax exemption, followed by a 50% reduction for the next 4 years.
High-tech projects (certified by the Ministry of Science and Technology):
4-year tax exemption, followed by a 50% reduction for the subsequent 9 years.
Import Duty Incentives
Import duty exemption applies to
Goods forming fixed assets of incentive-eligible investment projects.
Raw materials and components not yet produced domestically (subject to confirmation by the Ministry of Industry and Trade).
Goods used for manufacturing export products (in accordance with Article 16 of Law No. 107/2016/QH13).
Building Density & Height
Building density: 40–60% (depending on the land plot), with 20–30% allocated for green spaces.
Factory height: Maximum 25–45 m (3–6 floors), depending on zoning for heavy industry or mechanical sectors.
Fire Protection & Firefighting
Equipped with automatic sprinkler systems, D150 fire pipelines, and fire pumps with capacity of 2,500 m³/h.
Fire hydrant spacing: ≤120 m.
Chemical storage areas: Built with REI 150 fire-resistant walls and equipped with foam firefighting systems to ensure industrial safety.
Infrastructure Management Fee
Road maintenance: USD 0.05/m²/month.
Electricity, water supply, and wastewater services: VND 5,000–8,000/m²/year (approximately USD 0.19–0.30).
Electricity & Water Prices
Industrial electricity (EVN tariff): USD 0.05–0.13/kWh (approximately VND 1,250–3,200/kWh).
Clean water: VND 8,000–12,000/m³ (approximately USD 0.32–0.48), depending on consumption volume.
Wastewater Treatment Fee
VND 10,000–20,000/m³ (approximately USD 0.40–0.80), calculated based on COD/BOD levels, with monthly payment.
IPAVIETNAM
Hotline/Zalo/WhatsApp: +84-83-555-3388
WeChat ID: fdivietnam
E-mail: support@ipavietnam.org
Contact person:
Mr. Gia Bao, Investment Promotion Officer
Cell phone: +84-941-898-117
E-mail: bao.ipavietnam@gmail.com
Note: We only provide consultancy service and information on industrial parks, industrial clusters, ready built factories to enterprises or investors who contact us directly. We do not exchange information through brokers or other intermediary channels.
No Document!