Please Login to use our services.
If you are not our member, please register here or contact us via email support@ipavietnam.org for our further support.
Dai An Industrial Park Expansion benefits significantly from the well-established infrastructure and industrial ecosystem of the existing Dai An Industrial Park, one of the most successful industrial parks in Hai Phong with a high occupancy rate and strong presence of Japanese FDI enterprises. Strategically located along National Highway 5 and near the Hanoi – Hai Phong Expressway, the park offers excellent connectivity to seaports, international airports, and major industrial hubs in Northern Vietnam. The presence of major corporations such as Sumitomo, Denso, and Panasonic enhances supply chain integration and industrial linkages. With its expanded land bank, modern infrastructure, and competitive costs, the park is well-positioned to attract large-scale investments, particularly in supporting industries and high-tech manufacturing.
Adjacent to National Highway 5 (Hanoi – Hai Phong corridor)
Close to Hanoi – Hai Phong Expressway
~55 km to Hanoi
~45–60 km to Hai Phong seaport system
~70 km to Noi Bai International Airport
Modern and synchronized infrastructure leveraging the existing Dai An Industrial Park
Stable electricity and water supply systems with centralized wastewater treatment
Ready-built factories and logistics warehouses
Service areas, worker housing, and social amenities
Electronics and electronic components
Mechanical engineering and electrical equipment
Automobile and auto parts manufacturing
Supporting industries
Consumer goods and light industry
Corporate Income Tax (CIT): 2-year exemption and 50% reduction for the following 4 years
Preferential CIT rate: ~10%–17% depending on sector
Import duty exemption for machinery and equipment forming fixed assets
Land rent incentives depending on project scale
Administrative support for licensing and investment procedures
Construction Density: ≤ 70%
Factory Height: Typically 2–5 floors
Green Space Ratio: ≥ 10%
Building Setback: Minimum 4 m (long side), 3.5 m (gable side)
Management fee: ~USD 0.5–1/m²/year
Ready-built factory rent: ~USD 3.5–6.5/m²/month
Electricity cost: ~USD 0.08–0.12/kWh
Water supply cost: ~USD 0.4–0.8/m³
Wastewater treatment fee: ~USD 0.3–0.6/m³
IPAVIETNAM
Hotline/Zalo/WhatsApp: +84-83-555-3388
WeChat ID: fdivietnam
E-mail: support@ipavietnam.org
Contact person:
Ms. Thanh An, Investment Promotion Officer
Cell phone: +84-397-061-299
E-mail: an.ipavietnam@gmail.com
Note: We only provide consultancy service and information on industrial parks, industrial clusters, ready built factories to enterprises or investors who contact us directly. We do not exchange information through brokers or other intermediary channels.
No Document!