Please Login to use our services.
If you are not our member, please register here or contact us via email support@ipavietnam.org for our further support.
Cha La Industrial Park, Tay Ninh stands out with a strategic location at the western gateway of Vietnam, approximately 82–87 km from Ho Chi Minh City, offering fast connectivity to Tan Son Nhat International Airport, Saigon Port, and the Moc Bai – Phnom Penh border gate (Cambodia), facilitating efficient logistics links to Thailand.
Grade-A integrated infrastructure includes a stable 22kV power supply, clean water capacity of 2,500 m³/day, and a centralized wastewater treatment system of 2,500 m³/day meeting QCVN 40:2011/BTNMT standards. The internal road network is wide and well-developed, with solid ground conditions (1.5–2.5 kg/cm²). With a high occupancy rate of 97–98%, the industrial park has attracted a wide range of priority industries, particularly high-tech manufacturing, precision engineering, and electronics from Japan and South Korea.
Key Distances
Tay Ninh City Center: ~11 km
Ho Chi Minh City: ~85 km
Tan Son Nhat International Airport: ~83 km
Saigon Port: ~87 km
Moc Bai International Border Gate: ~34 km
Xa Mat Border Gate: ~40 km
Transport Connectivity & Logistics Advantages
DT784 serves as a major transport artery, enabling efficient cargo movement to HCMC and neighboring provinces.
Integrated road infrastructure ensures smooth regional connectivity.
Central provincial location enhances domestic supply chain efficiency.
Approximately 17 km from Dau Tieng Lake, supporting environmentally oriented and clean industrial development.
Internal transportation
Main road 25m wide; internal roads 12m wide (7m sidewalk on each side); hot asphalt concrete surface, convenient for container trucks.
Electricity and clean water
22kV medium voltage electricity, connected to the 110/15-22kV Go Dau & 110kV Hoa Thanh substations; clean water supply of 2,500 m³/day.
Wastewater treatment and telecommunications
Centralized treatment plant with a capacity of 500 m³/day (Type B); full telecommunications: telephone, fax, high-speed internet.
Safety amenities
24/7 fire protection system; local police station within the premises; fully equipped medical station.
The Cha La Industrial Park in Tay Ninh focuses on attracting diverse, clean industries, prioritizing sectors that do not generate toxic waste causing environmental pollution.
Corporate Income Tax (CIT) Incentives
General incentives:
Exemption from Corporate Income Tax (CIT) for the first 2 years from the year taxable income is generated, followed by a 50% reduction of payable CIT for the subsequent 4 years (standard CIT rate: 20%).
For high-tech projects and supporting industries:
Preferential CIT rate of 10% for 15 years, with full tax exemption for the first 4 years and a 50% tax reduction for the following 9 years.
Import Duty Incentives
Exemption from import duties for machinery, equipment, components, and specialized vehicles imported to form fixed assets for new investment projects, in accordance with Decree No. 134/2016/ND-CP and other applicable general regulations.
Infrastructure Capacity
Power: 110kV/22kV supply from Hoa Thanh Substation, with designed capacity sufficient for the entire industrial park (42.19 ha – Phase 1).
Clean water: Water treatment plant with a capacity of 2,600 m³/day.
Wastewater treatment: Centralized wastewater treatment plant with a capacity of 2,500 m³/day (meeting QCVN 40:2011/BTNMT – Class B, comprising modules of 500 m³ + 2,000 m³).
Fire Prevention & Fighting
The fire prevention and firefighting (FPF) system complies with national TCVN standards, supported by the Duong Minh Chau District Fire Prevention, Firefighting & Rescue Police, operating 24/7. The wide internal road network ensures convenient access for fire engines.
Infrastructure Maintenance Fee
Maintenance fee is 0.3 USD/m²/year
Electricity Price
Peak hours: 3,322 VND/kWh
Normal hours: 1,819.8 VND/kWh
Off-peak hours: 1,188 VND/kWh
These prices apply to electricity from the 110kV Hoa Thanh substation, and are close to the general industrial electricity price in 2026 (approximately 3,348 VND/kWh peak hours for sub-22kV).
Water and Wastewater Treatment Price
Clean water price: 9,200 VND/m³ (including 5% VAT), from a plant with a capacity of 2,600 m³/day.
Wastewater treatment fee: 8,500 VND/m³ (before VAT), at a treatment plant with a capacity of 2,500 m³/day.
IPAVIETNAM
Hotline/Zalo/WhatsApp: +84-83-555-3388
WeChat ID: fdivietnam
E-mail: support@ipavietnam.org
Contact person:
Mr. Gia Bao, Investment Promotion Officer
Cell phone: +84-941898117
E-mail: bao.ipavietnam@gmail.com
Note: We only provide consultancy service and information on industrial parks, industrial clusters, ready built factories to enterprises or investors who contact us directly. We do not exchange information through brokers or other intermediary channels.
No Document!