Investment Location Search

Binh Dong Industrial Park

136
Slide 0
Slide 1
Slide 2

Binh Dong Industrial Park

Planned area: 211,96 ha
Land use term: 50 years (2022 – 2072)
Leasable area: 1 - 5 ha
Leasing price: Negotiation
Project highlights:

Binh Dong Industrial Park, located in Binh Dong Commune, Go Cong Town, Tien Giang Province, serves as the eastern gateway of the province, strategically positioned at the foot of My Loi Bridge with direct access to National Highway 50 and Ho Chi Minh City. Only 46 km from Tan Son Nhat International Airport and 15 km from Hiep Phuoc Port, the park offers outstanding multimodal logistics connectivity. Spanning 212 hectares, including 160 hectares of industrial land, it features synchronized infrastructure with a 110kV/50MVA power supply, 8,000 m³/day water capacity, and Class A wastewater treatment. With an 11-year land rental exemption, competitive labor costs, and a large ready-to-develop land bank, Binh Dong is a strategic destination for FDI in wood processing, textiles, electronics, and metal industries.

Site connection

Boundaries & Access
North/South/East: Adjacent to Soai Rap dyke (DH.99B)
West: Bordering the industrial park ring road and planned residential area
Transport: My Loi Bridge significantly reduces travel time and strengthens connectivity to HCMC and coastal areas
Key Distances
Go Cong Town: 15 km (via NH50)
Ho Chi Minh City: 50 km
Tan Son Nhat International Airport: 46 km
Hiep Phuoc Port: 15 km

Infrastructure situation

Internal Roads
30–40m main roads, 15–20m secondary roads; site leveling largely completed with strong regional connectivity.
Power Supply
22kV provincial grid, 50–100 MW capacity; extended to plot boundaries, finalizing synchronized operation.
Water Supply
4,000 m³/day capacity; under construction with fast-track connection for early investors.
Wastewater Treatment
5,000 m³/day, Class A standard; nearing completion, preliminary treatment required before connection.

Attraction fields

Wood & natural materials
Textiles & garment manufacturing
Metal, rubber & plastics
Paper products & finished furniture
Pharmaceuticals & chemicals
Automotive, electronics & electrical equipment
Other advanced manufacturing (medical devices, sports equipment, jewelry, toys…)

Investment Incentives

Corporate Income Tax 
2-year tax exemption from the first taxable income
50% tax reduction for the following 4 years (Applicable to new investment projects in the industrial park under prevailing regulations)

Import Duty
Exemption on imported machinery, equipment, specialized vehicles, and components used to form fixed assets of the project

Technical information

Electricity Tariff: Based on EVN Tien Giang’s prevailing rates (approx. VND 1,800–3,500/kWh)
Water Supply: VND 10,500/m³ (subject to provincial regulations)
Wastewater Treatment Fee: Depending on input quality (estimated USD 0.3–0.5/m³)

Related costs

Total Area: 211.96 hectares
(Industrial land: 160.40 hectares – 75.67%)
Building Coverage Ratio: Up to 60% of plot area
Maximum Building Height: 7 floors (≤ 30 meters)

Contact information

IPAVIETNAM
Hotline/Zalo/WhatsApp: +84-83-555-3388
WeChat ID: fdivietnam
E-mail: support@ipavietnam.org
Contact person:
Mr. Gia Bao, Investment Promotion Officer
Cell phone: +84-941-898-117
E-mail: bao.ipavietnam@gmail.com
Note: We only provide consultancy service and information on industrial parks, industrial clusters, ready built factories to enterprises or investors who contact us directly. We do not exchange information through brokers or other intermediary channels.

Video

No Video!

Document

No Document!

Other Industrial Parks

See all >>
Tang Loong Industrial Park
Tang Loong Industrial Park
Lao Cai | 1,100 ha | $60 - $70
Dong Banh Industrial Park
Dong Banh Industrial Park
Lang Son | 162 ha | $70 - $80
VSIP Lang Son Industrial Park
VSIP Lang Son Industrial Park
Lang Son | 599.76 ha | $100 - $110
Tan Dan Industrial Park
Tan Dan Industrial Park
Hung Yen | 200 ha | $160 - $170
Yen My Industrial Park
Yen My Industrial Park
Hung Yen | 280 ha | $160 - $170
Industrial Park No. 03 – Hung Yen
Industrial Park No. 03 – Hung Yen
Hung Yen | 159.71 ha | $140 - $150
Yen My II Industrial Park
Yen My II Industrial Park
Hung Yen | 313,5 ha | Negotiation
Industrial Park No. 1 – Phase 1
Industrial Park No. 1 – Phase 1
Hung Yen | 216.17 ha | $150 - $160
Ly Thuong Kiet Industrial Park
Ly Thuong Kiet Industrial Park
Hung Yen | 314.2 ha | $150 - $160
Lac Thinh Industrial Park
Lac Thinh Industrial Park
Phu Tho | 220 ha | $80 - $90
Binh Phu Industrial Park
Binh Phu Industrial Park
Phu Tho | 214.29 ha | $100 - $110
Thanh Ha Industrial Park
Thanh Ha Industrial Park
Phu Tho | 282 ha | $90 - $100