Investment Location Search

Bim Son B Industrial Park

16
Slide 0
Slide 1
Slide 2
Slide 3
Slide 4

Bim Son B Industrial Park

Location: Thanh Hoa
Planned area: 216.29ha
Land use term: 2008-2058
Leasable area: 30 - 50 ha
Leasing price: $60 - $70
Project highlights:

Bim Son B Industrial Park is located in Bim Son Town, Thanh Hoa Province, with a planned area of approximately 540 hectares. The park is designed as a multi-sector industrial zone focusing on building materials, mechanical engineering, supporting industries, and manufacturing. Strategically positioned near National Highway 1A and the North–South railway, and about 40 km from Nghi Son Port, it offers convenient logistics connections for both domestic distribution and export activities. The infrastructure is comprehensively developed, including internal road networks, a 110 kV power supply system, high-capacity water supply, and a centralized wastewater treatment plant. Bim Son B is expected to become a new industrial growth driver in northern Thanh Hoa Province.

Site connection

3 km from the North–South Expressway interchange (Ha Long Commune, Ha Trung District)
Adjacent to National Highway 1A
Located at the border of Thanh Hoa and Ninh Binh provinces
40 km south of Thanh Hoa City center
​​​​​​​90 km from Nghi Son Deep-Sea Port
60 km from Tho Xuan Airport (Thanh Hoa)
110 km south of Hanoi Capital

Attraction fields

Manufacturing and Processing Industries
Construction Materials Industry
Supporting Industries
Light and Consumer Industries
Logistics and Industrial Services

Investment Incentives

1. Land lease (raw land rental): Exemption from land rental during the factory construction period (03–05 years) from the date of signing the land sublease agreement with the infrastructure developer.
2. Infrastructure management and maintenance fee: Exemption for up to 03 years from the date of signing the land sublease agreement with the infrastructure developer.
3. Corporate Income Tax (CIT):
- 100% exemption for the first 02 years from the time taxable income is generated.
- 50% reduction for the subsequent 04 years.
4. Import and Export Duties:
Exemption from import duty for goods used to create fixed assets and specialized transport vehicles forming part of the project’s technological production line.
​​​​​​​- Exemption from import duty for 05 years from the commencement of production for raw materials, supplies, components, and semi-finished products that are not yet domestically produced or do not meet required quality standards in Vietnam.

Technical information

Construction density: maximum 60%.

Related costs

Raw land rental: USD 0.18/m2/year (excluding VAT).
Infrastructure management and maintenance fee: USD 0.25/m2 (including VAT).
Wastewater treatment fee: USD 0.47/m3 (including VAT).
Clean water tariff: USD 0.61/m3 (including VAT).
35 kV medium-voltage electricity tariff: In accordance with the general tariff schedule of Vietnam Electricity (EVN).

Contact information

IPAVIETNAM
Hotline/Zalo/WhatsApp: +84-83-555-3388
WeChat ID: fdivietnam
E-mail: support@ipavietnam.org
Contact person:
Ms. Thanh An, Investment Promotion Officer
Cell phone: +84-397-061-299
E-mail: an.ipavietnam@gmail.com
Note: We only provide consultancy service and information on industrial parks, industrial clusters, ready built factories to enterprises or investors who contact us directly. We do not exchange information through brokers or other intermediary channels.

Document

No Document!

Other Industrial Parks

See all >>
Trang Due 3 Industrial Park
Trang Due 3 Industrial Park
Hai Phong City | 652.73 ha | Negotiation
Tien Lang Airport Industrial Park – Zone B
Tien Lang Airport Industrial Park – Zone B
Hai Phong City | 186.49 hectares | $120 - $130
Hanoi Southern Supporting Industrial Park (HANSSIP)
Hanoi Southern Supporting Industrial Park (HANSSIP)
Hanoi City | 640 ha | Negotiation
Dai Ngai Industrial Park
Dai Ngai Industrial Park
Can Tho City | 200 ha | Negotiation
Binh Dinh Becamex VSIP Industrial Park
Binh Dinh Becamex VSIP Industrial Park
Gia Lai | 1.374 ha (1000 ha IP, 374 ha C&R) | Negotiation
Xuan Cam – Huong Lam Industrial Park
Xuan Cam – Huong Lam Industrial Park
Bac Ninh | 224.02 ha (Phase 1: 102.85 ha – Phase 2: 121.17 ha) | $70 - $80
Tien Son – Ninh Son Industrial Park
Tien Son – Ninh Son Industrial Park
Bac Ninh | ~222.98 ha (phase 1: 89.57 ha; phase 2 planned ~133.41 ha) | Negotiation
Que Vo II Industrial Park – Phase 2
Que Vo II Industrial Park – Phase 2
Bac Ninh | ~285.67 ha (industrial land ~277.64 ha) | $130 - $140
Tran De Industrial Park
Tran De Industrial Park
Can Tho City | 160 ha | < $60
Cha La Industrial Park
Cha La Industrial Park
Tay Ninh | 42,19 ha | Negotiation
Thanh Thanh Cong Industrial Park
Thanh Thanh Cong Industrial Park
Tay Ninh | 760 ha | Negotiation
My Tho Industrial Park
My Tho Industrial Park
Dong Thap | 79,14 ha | Negotiation