Bac Thach Ha Industrial Park (Ha Tinh) is emerging as a promising investment destination thanks to its modern planning and strategic location in Thach Ha District. The park is located near the Bai Vot – Vung Ang Expressway and National Highway 1A, providing convenient access to Vung Ang Port and Vinh International Airport, which supports efficient import–export logistics. The project includes about 122 hectares of flexible industrial land, internal roads capable of handling heavy container traffic, and 17 hectares of green spaces and water areas, creating a clean and sustainable industrial environment. The park is developed by VSIP following the Smart Industrial Park model, integrating digital management and real-time environmental monitoring systems. Priority sectors include green industries such as electronics, automobile assembly, pharmaceuticals, chemicals, and textiles. With competitive costs, attractive investment incentives, and abundant labor, Bac Thach Ha Industrial Park offers strong potential to attract large-scale FDI projects and support regional economic growth.
Transportation Connectivity
Approximately 35 km from Vung Ang Port, supporting convenient import–export logistics.
Located adjacent to the Bai Vot – Ham Nghi Expressway along its southern boundary.
Around 75 km from Vinh International Airport.
Bordered by National Highway 1A to the north.
Directly connected to National Highway 15B to the south.
Services & Resources
About 15 km from Ha Tinh city center.
Approximately 10 km from Bac Ha Tinh Industrial Park.
Abundant labor supply from Thach Ha District, a densely populated area.
Close to schools and healthcare facilities in Thach Lien Commune and Viet Tien Commune.
Internal Transportation Infrastructure
Main internal roads are 30–45 m wide (4–6 lanes), while branch roads range from 15–25 m, paved with asphalt and equipped with complete drainage systems and LED lighting.
The park provides direct connectivity to National Highway 1A and the Bai Vot – Ham Nghi Expressway, ensuring smooth traffic for container trucks and heavy vehicles.
Power Supply System
A 110 kV substation with a capacity of 100 MVA (Phase 1) provides a stable electricity supply from the national power grid.
The park uses underground cable systems with capacity reserves to support large-scale industrial production.
Water Supply System
Total water supply capacity reaches 40,000 m³ per day, sourced from the provincial water supply network of Ha Tinh.
Water quality meets QCVN 01, supported by storage reservoirs and pressure pumps ensuring 24/7 supply.
Wastewater Treatment
A centralized wastewater treatment plant with a capacity of 25,000 m³ per day applies biological treatment technology, meeting Column A standards under QCVN 40:2021 before discharge into local water systems.
Individual factories are required to pre-treat wastewater to Column B standards before connecting to the central treatment facility.
Mechanical engineering, automotive components, and electronics manufacturing
Production of advanced electrical and electronic equipment
Agro–forestry–seafood processing industries
Textiles, garments, footwear, and consumer goods manufacturing
Construction materials and environmentally friendly chemical production
Logistics and industrial support services
Corporate Income Tax (CIT) Incentives
Preferential tax rate: 10% for 15 years (instead of the standard 20%).
Standard sectors/projects
2-year tax exemption, followed by a 50% reduction for the next 4 years.
High-tech projects (certified by the Ministry of Science and Technology):
4-year tax exemption, followed by a 50% reduction for the subsequent 9 years.
Import Duty Incentives
Import duty exemption applies to
Goods forming fixed assets of incentive-eligible investment projects.
Raw materials and components not yet produced domestically (subject to confirmation by the Ministry of Industry and Trade).
Goods used for manufacturing export products (in accordance with Article 16 of Law No. 107/2016/QH13).
Building Density
Factories and warehouses: Maximum 70% of the land plot area.
Service buildings: Maximum 50% of the land plot area.
Land allocation:
Industrial production land: >122 ha (approx. 64%)
Green spaces and water areas: >17 ha (approx. 9%)
Transportation infrastructure: >28 ha (approx. 15%)
Building Height
Factories and warehouses: Up to 5 floors.
Service buildings: Up to 10 floors.
Fire Protection System
Internal roads 15–45 m wide, allowing access for fire-fighting vehicles.
Equipped with automatic sprinkler systems and other fire protection solutions in accordance with industrial safety standards.
Infrastructure & Management Fees
Management fee: around 0.5 USD/m²/year, typically paid twice per year.
Infrastructure usage fee: approximately 3,000 – 6,000 VND/m²/year, a common range for Central Vietnam industrial zones.
Basic Utilities
Clean water price: about 0.40 – 0.45 USD/m³, metered according to actual consumption.
Wastewater treatment fee: around 0.25 – 0.35 USD/m³; wastewater must be pre-treated to Column B standards before centralized treatment to Column A.
Electricity price: based on tariffs of EVN, roughly 0.13 USD/kWh during peak hours and 0.08 USD/kWh during normal hours.
IPAVIETNAM
Hotline/Zalo/WhatsApp: +84-83-555-3388
WeChat ID: fdivietnam
E-mail: support@ipavietnam.org
Contact person:
Mr. Gia Bao, Investment Promotion Officer
Cell phone: +84-941-898-117
E-mail: bao.ipavietnam@gmail.com
Note: We only provide consultancy service and information on industrial parks, industrial clusters, ready built factories to enterprises or investors who contact us directly. We do not exchange information through brokers or other intermediary channels.
No Document!