Bac Chu Lai Industrial Park is considered an “investment paradise” within the Chu Lai Open Economic Zone, thanks to its strategic location. The park is situated next to National Highway 1A and the Da Nang – Quang Ngai Expressway, and is close to Chu Lai Airport and Dung Quat Port—forming an ideal ASEAN export gateway. The industrial park has a wastewater treatment plant with a capacity of 1,900 m³/day, which has been operating stably for over 10 years. It is also connected to the North–South railway, and is planned with six functional zones, including service areas, production zones, and modern green spaces. The total investment capital is VND 607.8 billion, with full completion expected by 2027. The park offers outstanding advantages for clean industries, automotive supporting industries, and precision mechanical engineering. Investors can benefit from significant tax incentives within the economic zone, along with access to a young, skilled, and cost-effective workforce. In addition, the park is part of the Chu Lai Motors – Thaco ecosystem, helping to create a complete industrial supply chain for manufacturing and supporting industries.
Seaports
Ky Ha Port: 11 km
Truong Hai Port: 2–3 km
Tam Hiep Port: 1 km
Dung Quat Port: 25 km
Airports
Chu Lai Airport: 5–8 km
Da Nang International Airport: 90–95 km
Expressway
Direct access to the Da Nang – Quang Ngai Expressway (about 2–2.5 km from National Highway 1A).
City Centers
Tam Ky City Center: 25 km
Da Nang City: 95 km
Major Industrial Centers
Adjacent to the THACO Chu Lai Automotive Industrial Park in the northwest.
Dung Quat Economic Zone: 25 km away.
Railway Stations
An Tan / Nui Thanh Railway Stations: 3–7 km.
Labor Supply & Amenities
Located near worker housing areas (southeast of the park).
Abundant labor force from Nui Thanh District and Tam Ky City.
Schools & Hospitals
Available within a 20–30 km radius from Tam Ky and Nui Thanh, with a complete local service system.
Internal Transportation
The internal road network is fully completed, providing direct connectivity to National Highway 1A (about 2.5 km away). The wide internal roads support efficient logistics and transportation.
Power Supply System
Electricity is supplied from the Ky Ha 110 kV substation (2 × 40 MVA) or the Ky Hoa 220/110 kV substation, ensuring a stable power supply with sufficient backup capacity for industrial production.
Water Supply System
Water is provided by the Tam Hiep Water Plant with a capacity of 15,000–20,000 m³/day, with pipelines connected directly to the factory boundary.
Wastewater Treatment
A centralized wastewater treatment plant with a capacity of 1,900 m³/day, operating since 2013, with a complete collection system meeting regulatory standards.
Target Industries
Mechanical engineering, electrical, electronics, and refrigeration manufacturing
Wood, rubber, and plastic processing; handicrafts production
Garment and textile manufacturing; export-oriented consumer goods
Processing of agricultural, forestry, and seafood products
Assembly of motor vehicles; electronic and micro-electronic components
Production of construction materials, glass, iron, and steel
Manufacturing of products for healthcare and education; interior decoration; transformers, motors, and automobile/motorcycle parts
Corporate Income Tax (CIT) Incentives
Preferential tax rate: 10% for 15 years (instead of the standard 20%).
Standard sectors/projects
2-year tax exemption, followed by a 50% reduction for the next 4 years.
High-tech projects (certified by the Ministry of Science and Technology):
4-year tax exemption, followed by a 50% reduction for the subsequent 9 years.
Import Duty Incentives
Import duty exemption applies to
Goods forming fixed assets of incentive-eligible investment projects.
Raw materials and components not yet produced domestically (subject to confirmation by the Ministry of Industry and Trade).
Goods used for manufacturing export products (in accordance with Article 16 of Law No. 107/2016/QH13).
Building Density
40–70% of the total land plot area, with at least 20% reserved for green spaces.
Factory Height
Maximum height below 45 meters (approximately 4–5 floors), depending on the detailed planning and fire safety regulations.
Fire Prevention and Fighting (PCCC)
Internal roads are at least 20 meters wide, with appropriate spacing between factory buildings.
Fire hydrants are installed in accordance with QCVN standards, ensuring safety for industries classified under hazard levels III–V.
Infrastructure Management Fee
0.25 USD/m²/year (excluding VAT), payable annually.
Wastewater Treatment Fee
According to local regulations, approximately 0.3–0.5 USD/m³ (depending on the discharge volume).
IPAVIETNAM
Hotline/Zalo/WhatsApp: +84-83-555-3388
WeChat ID: fdivietnam
E-mail: support@ipavietnam.org
Contact person:
Mr. Gia Bao, Investment Promotion Officer
Cell phone: +84-941-898-117
E-mail: bao.ipavietnam@gmail.com
Note: We only provide consultancy service and information on industrial parks, industrial clusters, ready built factories to enterprises or investors who contact us directly. We do not exchange information through brokers or other intermediary channels.
No Document!