Please Login to use our services.
If you are not our member, please register here or contact us via email support@ipavietnam.org for our best support.
To Da Nang City: 65km
To Chu Lai Airport: 25km
To Hoi An City: 25km
To Tam Ky City, Quang Nam Province: 6km
To Quang Ngai City: 60km
To Vinperl Quang Nam: 10km
Filled - up Land Condition: The land is filled up to standard level, compaction: K>=0.9; ready for construction.
Modern Road system: The road is spread asphalt with heavy loading to ensure transportation to each land lot. Main road: 36m. Branch road: 22.5m.
Stable Power supply system: The electricity line of 22KV is set up along the roads of the Capella Land’s Industrial Park and connected to every factory with sufficient and stable supplying capacity.
Clean Water supply and drainage system: The water supplying pipe is set up underground and connected to every factory with capacity up to 100,000m3/day. The drainage culvert system is set up along with the roads of the Industrial Park to guarantee non-flood.
The wastewater treatment: System is set up for collecting and treating all wastewater to meet the environment standard.
IT Facilities: The Industrial Park is equipped with modern IT system with wide range of services, such as telephone, high speed internet, internet conference.
315,319,317,466,465,318,320,
Industrial Zone Management Fee: 0.3 USD/m2/year
Raw land leasing fee paying for Government: 6000 VND/m2/year
Low labor cost: Minimum Salary Grade 3.
Incentive CIT Tax rate 10% for first 15 years.
CIT Holiday (0%): 4years. Reduce 50% for next 9 years.
Personal income tax reduce 50%
IPAVIETNAM
Hotline: +84-98-369-3699 | +84-83-555-3388
Email: support@ipavietnam.org
No Document!
Contact: | IPAVIETNAM |
Office: | +84 24 2238 9898 |
Hotline: | +84 83 555 3388 (WhatsApp, Viber, Zalo) |
Email: | support@ipavietnam.org |