Please Login to use our services.
If you are not our member, please register here or contact us via email support@ipavietnam.org for our further support.
Eco Logistics Center – Binh Duong stands out with its strategic location in a key FDI hub, offering access to a workforce of over one million and seamless connectivity to expressways, Cat Lai Port, the airport, and Ho Chi Minh City. The project provides modern logistics spaces with flexible sizes from 3,000 to 10,000 sqm and an exceptional floor load capacity of up to 3 tons per sqm, ideal for heavy-duty operations. Optimized design features include 11-meter clear height, automatic dock levelers, and direct container access, enhancing operational efficiency. A dedicated 1,000 kVA power supply ensures stable 24/7 performance. It is a safe and efficient choice for logistics and supply chain expansion.
Seaport Connectivity
Cat Lai Port (Ho Chi Minh City): 25 km – Vietnam’s largest container port
SPCT / Hiep Phuoc Port: 35 km – Capable of handling vessels up to 54,000 DWT
Expressway Access
Ho Chi Minh City – Long Thanh – Dau Giay Expressway: 5 km – Strategic connection to the Southeast region
My Phuoc – Tan Van Expressway: 10 km – High-speed logistics corridor
Air Connectivity
Tan Son Nhat International Airport: 30 km – 50–70 minutes to international terminals
Long Thanh International Airport: 25 km – Future major aviation hub
Urban Centers
Thu Dau Mot City: 15 km – 20–40 minutes travel time
District 1, Ho Chi Minh City: 35 km – 45–60 minutes travel time
Corporate Income Tax (CIT)
Standard CIT rate at the time of signing: 20% per annum
New projects in industrial zones: 2-year tax exemption, followed by a 50% reduction for the next 4 years
Projects in specially incentivized sectors: 4-year tax exemption, followed by a 50% reduction for the next 9 years
Import & Export Duties
Import duty exemption for machinery and equipment used to form fixed assets
Import duty exemption for raw materials used in export production
Export duty exemption for exported goods
Technical Specifications
Building density: 50–60% – Optimized land use in compliance with QCVN 01:2021/BXD
Building height: 8–11 m – Ideal for heavy engineering and logistics operations
Factory Specifications
Unit size: 3,000–10,000 m² – Flexible scaling for diverse production needs
Floor loading: 2.5–3 tons/m² – Designed to support heavy machinery and equipment
Automatic loading docks: 4–8 units – Enhancing smart warehousing and logistics efficiency
Roller shutter doors: 4 m height – Direct access for 40-ft containers
Fire protection: Equipped with automatic sprinkler system
IPAVIETNAM
Hotline/Zalo/WhatsApp: +84-83-555-3388
WeChat ID: fdivietnam
E-mail: support@ipavietnam.org
Contact person:
Mr. Gia Bao, Investment Promotion Officer
Cell phone: +84-941-898-117
E-mail: bao.ipavietnam@gmail.com
Note: We only provide consultancy service and information on industrial parks, industrial clusters, ready built factories to enterprises or investors who contact us directly. We do not exchange information through brokers or other intermediary channels.
No Document!