Image of Waste treatment

MA0004

Objective: Waste treatment
Land area: 12 ha
Period: 50 Years
Transfer rate: None
Location: Quang Tri
Post Your Project
To verify and qualify your project information on our Portal, please download the form below and send back to us via email support@ipavietnam.org. Thank you!
Site connection

Distance to the airport: 75 km
Distance to the city centre: 5 km

Project description

Waste-to-energy (WtE) or energy-from-waste (EfW) is the process of generating energy in the form of electricity and/or heat from the primary treatment of waste, or the processing of waste into a fuel source. WtE is a form of energy recovery. 
This project was fully certificated by local authority, in particular:
Dossiers of designing construction drawings of basic works conformable with the designs already appraised by construction departments.
Applicable standards on architecture, structure, power supply, water supply and drainage are basically and appropriately applied.
Types of supplies and materials used for construction of works in accordance with regulations.

Project status

Completed construction of solid waste management system

Budget/Selling price 5,700,000 USD
Cell phone Only member can view
E-mail Only member can view
Project teaser
Download
(Member only)
* Please Register to become our member to view and download any documents.
Post Your Project
To verify and qualify your project information on our Portal, please download the form below and send back to us via email support@ipavietnam.org. Thank you!

MA0001

Posted: 01/06/2020
Image of Office Building A++
Objective: Office Building A++
Land area: 3.557 m2
Period: 50 Years
Transfer rate: 100%
Location: Ha Noi

MA0008

Posted: 20/03/2020
Image of Hydropower plant
Objective: Hydropower plant
Land area: 133 ha
Period: 50 Years
Transfer rate: None
Location: Ha Giang

MA0007

Posted: 19/03/2020
Image of Hotel and Resort
Objective: Hotel and Resort
Land area: 10 ha
Period: 50 Years
Transfer rate: None
Location: Kien Giang

MA0006

Posted: 19/03/2020
Image of Waste treatment plant
Objective: Waste treatment plant
Land area: 10 ha
Period: 50 Years
Transfer rate: None
Location: Tra Vinh