Bac Giang Province

4,042 m2

2006 - 2056

- Along with 1A National highway
- Distance to Hanoi: 40km
- Distance to Noi Bai International Airport: 40km
- Distance to Hai Phong seaport: 110km
- Distance to Cai Lan deep seaport: 110km
- Distance to Vietnam - China bordergate: 100km
Completed construction and available for leasing
Road system:
- Main road: 32m (4 lanes)
- Other road: 23m (4 lanes)
Power system:
The 22/110KV power poles were installed along the roads in the IP, ensure supply power to the workshop
Water supply system:
- Capacity: 5,000 m3/day
- Water connection point is installed to the workshop
Waste water treatment plan:
- Capacity (1st phase): 3,000 m3/day
- The waste water is treated to A level
- Waste water connection point is installed to the workshop
Communication system:
The telecommunication system infrastructure is available to the workshop

All fields without pollution; Hi-tech products;

< $3/m2/month

Being updated...

Being updated...

Hotline: +84-24-2238-9898
Email: support@ipavietnam.org

Being updated...

Results (0)

  1. WS001BG

Link to our trusted members